Commons:National Archives and Records Administration/Categorize/US National Archives series: General Administrative Files, compiled 1935 - 1952

There is no need to edit this page to update the table once you have categorized a file. The bot updates the page approximately hourly and will write over any changes made by editors.

Category:US National Archives series: General Administrative Files, compiled 1935 - 1952
No. File Categorized?
1 View showing steamboat "Cochan" on the Colorado River near Yuma, Arizona. This picture was taken in 1900 by Mr. L. C.... - NARA - 295304.tif
2 Ballona Creek. Hole Sta. 13, south levee. - NARA - 295297.tif ✓ Done
3 Ballona Creek. View of north levee from south levee. - NARA - 295298.tif ✓ Done
4 Ballona Creek. View of north levee from south levee. - NARA - 295299.tif ✓ Done
5 Ballona Creek. Crack in south levee at Sta. 12-10. - NARA - 295300.tif ✓ Done
6 Ballona Creek. Hole on the side of north levee. Hole in shadow near shore. - NARA - 295301.tif ✓ Done
7 Ballona Creek. Crack at station 11-50 south levee. - NARA - 295302.tif ✓ Done
8 General view of construction in progress on the spillway - NARA - 295306.tif ✓ Done
9 Easterly view at downstream end of spillway showing an uncompleted portion of right spillway channel wall. The... - NARA - 295307.tif ✓ Done
10 A view of the partially completed ogee section of the spillway. Material for this structure was handled by stiff-leg... - NARA - 295308.tif
11 Looking east along the axis of the dam at a section of the spillway structure showing the cut-off wall between the... - NARA - 295309.tif ✓ Done
12 Erecting the ogee section of the spillway, employing stiff-leg derricks with 110-foot booms to elevate material and... - NARA - 295310.tif ✓ Done
13 Placing concrete in the cut-off wall on the axis of the dam on the west side of the spillway structure - NARA - 295311.tif ✓ Done
14 A general view of the upstream and of the spillway and intake structures looking east and showing the bearing pile in... - NARA - 295312.tif ✓ Done
15 A general view showing the construction of the compacted earth embankment looking east along the axis of the dam from... - NARA - 295313.tif ✓ Done
16 Looking upstream along the axis of the outlet channel showing the detail of construction. Note the arrangement of the... - NARA - 295314.tif ✓ Done
17 Downstream view from the right end of the spillway bucket showing concrete pouring operations on the crib cut-off... - NARA - 295316.tif
18 Upstream view from the top of the dam showing the service bridge and outlet control tower completed. Location, Prado... - NARA - 295317.tif ✓ Done
19 Forms and steel for the pier extension on the downstream side of the First Street Bridge. Note the form work around... - NARA - 295319.tif
20 Interior of the completed outlet control house, showing gas-electric stand-by unit, and at the right , one of teh two... - NARA - 295320.tif
21 Looking upstream in the outlet channel. Form work has been stripped from the outlet control tower and service bridge... - NARA - 295321.tif ✓ Done
22 Westerly view along the top of the spillway showing the completed service bridge and handrails. The outlet control... - NARA - 295322.tif ✓ Done
23 Verdugo Wash. View looking up the channel from the section between Glenoaks Blvd. and Royal Blvd. showing concrete... - NARA - 295324.tif ✓ Done
24 Verdugo Wash. View of Verdugo Wash storm drain looking north between Glenoaks Blvd. and Royal Blvd., showing sections... - NARA - 295325.tif ✓ Done
25 La Crescenta District. Eagle-Shields channel. View north from the junction of Montrose and Pennsylvania Avenues. The... - NARA - 295326.tif ✓ Done
26 La Crescenta District. Eagle-Sheilds Channel. View north from Mayfield Avenue showing a covered section in the... - NARA - 295327.tif
27 Santa Ynez Quarry No. 2, looking up the quarry a few days after a big blast. This quarry operates in conjunction with... - NARA - 295328.tif
28 Lower Los Angeles River (near Huntington Park), looking northwest from Firestone Boulevard Bridge, showing completed... - NARA - 295329.tif
29 Kenter Canyon Storm Drain in Santa Monica. View easterly towards Main Street, showing the placing of the brick arch.... - NARA - 295330.tif
30 Kenter Canyon Storm Drain, Santa Monica. View easterly in the bottom of a forty foot trench in Pico Street near Main... - NARA - 295331.tif
31 Ballona Creek project in the southwestern part of the City of Los Angeles showing appurtenant structures in... - NARA - 295332.tif ✓ Done
32 Kenter Canyon Project in Santa Monica. A view of a tunnel section excavated under a Pacific Electric Railway... - NARA - 295333.tif
33 Inlet structure from Burbank Wash into Los Angeles River near Glendale. Los Angeles River Subproject No. 134- ERA... - NARA - 295335.tif
34 Ballona Creek Subproject No. 132 - Completed footing for the center pier of the Pacific Electric Del Rey Line bridge.... - NARA - 295337.tif ✓ Done
35 Ballona Creek Subproject No. 132 - Era Funds - Hired Labor - Taken June 12, 1937. Vol. VII No. 6 - Placing... - NARA - 295338.tif ✓ Done
36 Ballona Creek Subproject No. 132 - Era Funds - Hired Labor - Taken June 23, 1937. Vol. VII No. 7 - In the Foreground... - NARA - 295339.tif ✓ Done
37 Ballona Creek Subproject No. 132 - Era Funds - Hired Labor -Taken June 12, 1937. Vol. VII No. 8 - This View Shows the... - NARA - 295340.tif ✓ Done
38 Los Jardines Subproject No. 5013-A - Era Funds - Hired Labor - Taken May 28, 1937. Vol. VII No. 20 - View from... - NARA - 295341.tif
39 Long Beach - Los Angeles Harbor Breakwater - Contract W-509-Eng.-103 - Rohl-Connolly Co. - Vol. VII No. 28 - Derrick... - NARA - 295342.tif ✓ Done
40 Long Beach - Los Angeles Harbor Breakwater - Contract W-509-Eng.-103 - Rohl-Connolly Co. - Vol. VII No. 29 - These... - NARA - 295343.tif ✓ Done
41 Los Angeles District - Hansen Dam Subproject No. 162 - Work Done Under Contract - Regular Funds - Taken March 13... - NARA - 295345.tif
42 Los Angeles District - Hansen Dam Subproject No. 162 - Work Done Under Contract - Regular Funds - Taken March 13... - NARA - 295346.tif
43 Los Angeles District - Hansen Dam Subproject No. 162 - Work Done Under Contract - Regular Funds - Taken March 13... - NARA - 295347.tif
44 Los Angeles District - Hansen Dam Subproject No. 162 - Work Done Under Contract - Regular Funds - Taken March 31... - NARA - 295348.tif
45 Los Angeles District - Hansen Dam Subproject No. 162 - Work Done Under Contract - Regular Funds - Taken March 31... - NARA - 295349.tif
46 Los Angeles District - Prado Dam Subproject No. 210 - Work Done Under Contract - Regular Funds - Taken March 11... - NARA - 295350.tif
47 Los Angeles District - Prado Dam Subproject No. 210 - Work Done Under Contract - Regular Funds - Taken March 31... - NARA - 295351.tif
48 Los Angeles District - Prado Dam Subproject No. 210 - Work Done Under Contract - Regular Funds - Taken March 31... - NARA - 295352.tif
49 Los Angeles District - Los Angeles River Subproject No. 166 - Regular Funds - Hired Labor - Taken March 8, 1939. Vol.... - NARA - 295353.tif ✓ Done
50 Los Angeles District - Ballona Creek Subproject No. 132 - E.R. A. and Regular Funds - Hired Labor - Taken June 20... - NARA - 295355.tif ✓ Done
51 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken April... - NARA - 295356.tif
52 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken April 1... - NARA - 295357.tif
53 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken June 20... - NARA - 295358.tif
54 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken June 13... - NARA - 295359.tif
55 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken June 11... - NARA - 295360.tif ✓ Done
56 Los Angeles District - Los Angeles River Subproject No. 129 - E.R.A. and Regular Funds - Hired Labor - Taken June 30... - NARA - 295361.tif