File:AERIAL VIEW OF TIETON DAM, UPSTREAM FACE OF DAM (Trashrack-structure for outlet at lower left in reservoir, spillway at upper left. Reservoir nearly empty due to drought.) - HAER WASH,39-NACH.V,2-32.tif

Original file(5,000 × 3,985 pixels, file size: 19 MB, MIME type: image/tiff)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

AERIAL VIEW OF TIETON DAM, UPSTREAM FACE OF DAM (Trashrack-structure for outlet at lower left in reservoir, spillway at upper left. Reservoir nearly empty due to drought.) - Tieton Dam, South and East of State Highway 12, Naches, Yakima County, WA
Title
AERIAL VIEW OF TIETON DAM, UPSTREAM FACE OF DAM (Trashrack-structure for outlet at lower left in reservoir, spillway at upper left. Reservoir nearly empty due to drought.) - Tieton Dam, South and East of State Highway 12, Naches, Yakima County, WA
Description
Weymouth, Frank; Crowe, Frank; Maul, David, transmitter
Depicted place Washington; Yakima County; Naches
Date Documentation compiled after 1968
Dimensions 4 x 5 in.
Current location
Library of Congress Prints and Photographs Division Washington, D.C. 20540 USA http://hdl.loc.gov/loc.pnp/pp.print
Accession number
HAER WASH,39-NACH.V,2-32
Credit line
This file comes from the Historic American Buildings Survey (HABS), Historic American Engineering Record (HAER) or Historic American Landscapes Survey (HALS). These are programs of the National Park Service established for the purpose of documenting historic places. Records consist of measured drawings, archival photographs, and written reports.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.

Notes
  • Significance: At the time of its completion in 1925, the Tieton Dam was the highest earthfill dam in the world. "Two of the foremost engineers in Western water development, Frank Crowe and Frank Weymouth, were involved in its construction." [CH2M Hill 1984: 17]. Several innovative construction methods involving the use of tunnels and shafts were applied to excavate the core wall, for deep excavations and unconsolidated rock surfaces made open trenching an impossibility. An important unit of the Bureau of Reclamation's Yakima Project, the Tieton Division is a series of storage dams, including the Tieton Dam, and complex conveyance systems that opened large areas of dry shrubland to irrigation and permanent settlement. The success of this project spurred development of irrigated agriculture throughout central and eastern Washington. The Tieton Dam was determined to be eligible for listing in the National Register of Historic Places in 1983.
  • Survey number: HAER WA-20
  • Building/structure dates: 1925 Initial Construction
Source https://www.loc.gov/pictures/item/wa0233.photos.369763p
Permission
(Reusing this file)
Public domain This image or media file contains material based on a work of a National Park Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See the NPS website and NPS copyright policy for more information.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:18, 4 August 2014Thumbnail for version as of 19:18, 4 August 20145,000 × 3,985 (19 MB) (talk | contribs)GWToolset: Creating mediafile for Fæ. HABS 2014-08-04 (3601:3800) Penultimate Tranche!

Metadata