File:Ahrtal - Altenahr 2022.jpg

Original file(1,911 × 904 pixels, file size: 1.32 MB, MIME type: image/jpeg)

Captions

Captions

Altenahr in early 2022

Summary edit

Description
Deutsch: Im April 2022, acht Monate nach der Flutkatastrophe im Ahrtal (August 2020), ist der Wiederaufbau voll im Gang. Es wird noch Jahre dauern, bis alle Schäden behoben sind. Hier in Altenahr am Fuße der Burg Are.
English: In April 2022, eight months after the flood disaster in the Ahr Valley (August 2020), reconstruction is in full swing. It will take years before all the damage has been repaired. Here in Altenahr at the foot of Are Castle.
Date
Source Own work
Author Optimi4

Licensing edit

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:55, 29 November 2022Thumbnail for version as of 15:55, 29 November 20221,911 × 904 (1.32 MB)Optimi4 (talk | contribs)Uploaded own work with UploadWizard

File usage on other wikis

The following other wikis use this file:

Metadata