File:ArcelorMittal Orbit - June11.jpg

Original file(2,856 × 4,296 pixels, file size: 2.04 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description

Work-in-progress June 2011 with outer steel spirals now underway. Sculptor: Anish Kapoor, Structural Designer: Cecil Balmond, Architecture: Ushida Findlay Architects (UFA), Design and Engineering: Ove Arup. The controversial red tubular steel tower will be 115m tall and completion is due in spring 2012. The foundations consist of 51 concrete piles of diameter 0.9m and length 25m. Project cost about 20million GBP. London Borough of Newham.

Orbit Tower Set...

(CC-by-SA which means anyone can freely use any size of this image anywhere, provided accompanied by the credit — Image: George Rex.)
Date
Source

Orbit Tower (ArcelorMittal Orbit) #6

Author GeorgeRexTA [at] gmail [dot] com from London
Camera location51° 32′ 13.56″ N, 0° 00′ 52.06″ W Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing edit

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
This image, originally posted to Flickr, was reviewed on June 25, 2011 by the administrator or reviewer File Upload Bot (Magnus Manske), who confirmed that it was available on Flickr under the stated license on that date.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:21, 25 June 2011Thumbnail for version as of 18:21, 25 June 20112,856 × 4,296 (2.04 MB)File Upload Bot (Magnus Manske) (talk | contribs){{Information |Description=Work-in-progress June 2011 with outer steel spirals now underway. Sculptor: Anish Kapoor, Structural Designer: Cecil Balmond, Architecture: Ushida Findlay Architects (UFA), Design and Engineering: Ove Arup. The controversial r

Metadata