File:FMIB 33076 Installing 2500 HP Turbines at Gatun Lake Spillway, Panama Canal.jpeg

FMIB_33076_Installing_2500_HP_Turbines_at_Gatun_Lake_Spillway,_Panama_Canal.jpeg(583 × 283 pixels, file size: 64 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Author
Unknown authorUnknown author
Description
English: Installing 2500 H.P. Turbines at Gatun Lake Spillway, Panama Canal
  • Subject: Panama Canal (Panama), Gatun Lake (Panama), Hydraulic structures
  • Geographic Subject: Panama--Gatun Lake
  • Tag: Panama Canal
Date 1913
date QS:P571,+1913-00-00T00:00:00Z/9
institution QS:P195,Q219563
Current location
Accession number
Source/Photographer
English: (1913) Installing 2500 H.P. Turbines at Gatun Lake Spillway, Panama Canal, Mendville, PA: Keystone View Company
Permission
(Reusing this file)
Public domain This is a photograph from the Freshwater and Marine Image Bank at the University of Washington. Materials in the Freshwater and Marine Image Bank are in the public domain. No copyright permissions are needed. Acknowledgement of the Freshwater and Marine Image Bank as a source for borrowed images is requested.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:17, 15 August 2015Thumbnail for version as of 03:17, 15 August 2015583 × 283 (64 KB)BMacZeroBot (talk | contribs)