File:Last Turbine Blade Delivery at Turbine No 23 - geograph.org.uk - 837229.jpg

Last_Turbine_Blade_Delivery_at_Turbine_No_23_-_geograph.org.uk_-_837229.jpg(640 × 480 pixels, file size: 57 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Last Turbine Blade Delivery at Turbine No 23. Site construction manager Martin Hewitt looks on as 6 months of construction comes to an end with the delivery of the final turbine blade for the Scout Moor Wind Farm project.

Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008. 837169 837208 833206 824546 687214 696211

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex

Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Last Turbine Blade Delivery at Turbine No 23 / 
Paul Anderson / Last Turbine Blade Delivery at Turbine No 23
Camera location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing edit

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:43, 20 February 2011Thumbnail for version as of 19:43, 20 February 2011640 × 480 (57 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Last Turbine Blade Delivery at Turbine No 23 Site construction manager Martin Hewitt looks on as 6 months of construction comes to an end with the delivery of the final turbine blade for the Scout M

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata