File:Last Turbine Tower Delivery Passing Through Edenfield - geograph.org.uk - 996060.jpg
Last_Turbine_Tower_Delivery_Passing_Through_Edenfield_-_geograph.org.uk_-_996060.jpg (640 × 480 pixels, file size: 83 KB, MIME type: image/jpeg)
Captions
Summary edit
DescriptionLast Turbine Tower Delivery Passing Through Edenfield - geograph.org.uk - 996060.jpg |
English: Last Turbine Tower Delivery Passing Through Edenfield. On Saturday the 31st of May 2008 the last of the twenty six turbine towers was
delivered to the Scout Moor Wind Farm construction site. The convoy is seen here making it's way out of Edenfield on the A680 Rochdale Road. It was almost 6 months to the day since the first tower was delivered back in November 2007 https://www.geograph.org.uk/photo/621442 The tower sections in the picture were for Turbine Tower No 17 which was constructed during the first week of June 2008. 824546 822989 687214 754370 760102 698455 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Last Turbine Tower Delivery Passing Through Edenfield / |
InfoField | Paul Anderson / Last Turbine Tower Delivery Passing Through Edenfield |
Camera location | 53° 40′ 08″ N, 2° 18′ 18″ W | View this and other nearby images on: OpenStreetMap | 53.668930; -2.304900 |
---|
Object location | 53° 40′ 07″ N, 2° 18′ 16″ W | View this and other nearby images on: OpenStreetMap | 53.668570; -2.304400 |
---|
Licensing edit
This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 04:24, 23 February 2011 | 640 × 480 (83 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Last Turbine Tower Delivery Passing Through Edenfield On Saturday the 31st of May 2008 the last of the twenty six turbine towers was delivered to the Scout Moor Wind Farm construction site. The c |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|