File:Loading stone at Magheramorne - geograph.org.uk - 995271.jpg

Loading_stone_at_Magheramorne_-_geograph.org.uk_-_995271.jpg(640 × 410 pixels, file size: 67 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Loading stone at Magheramorne The building of the Channel Tunnel required a considerable quantity of stone. Belfast (and, to lesser extent, Coleraine) harbour made quite a contribution. Magheramorne supplied a few shiploads – this is Crescent’s “Urgence” loading by grab (conveyor is more common and faster).
Date
Source From geograph.org.uk
Author Albert Bridge
Attribution
(required by the license)
InfoField
Albert Bridge / Loading stone at Magheramorne / 
Albert Bridge / Loading stone at Magheramorne
Camera location54° 48′ 57″ N, 5° 46′ 07″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location54° 48′ 59″ N, 5° 46′ 04″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing edit

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Albert Bridge
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:26, 23 February 2011Thumbnail for version as of 04:26, 23 February 2011640 × 410 (67 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Loading stone at Magheramorne The building of the Channel Tunnel required a considerable quantity of stone. Belfast (and, to lesser extent, Coleraine) harbour made quite a contribution. Magheramor

There are no pages that use this file.

Metadata