File:New cycleway 3 - geograph.org.uk - 1452202.jpg

New_cycleway_3_-_geograph.org.uk_-_1452202.jpg(640 × 480 pixels, file size: 83 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: New cycleway 3 The western ramp for the new cycle and footbridge shows the elevated course of the deck in the central reservation. Considerable new construction was necessary at this end, as can be seen in the concrete work outside the original retaining wall. The span of the footbridge makes a convenient support for lane control lights, seen here flashing a red aspect. At times, contra-flow is in place on either carriageway. Photo taken on the A55 road just west of the Pen-y-Clip tunnel near Llanfairfechan, Conwy, Wales.
Date
Source From geograph.org.uk
Author Jonathan Wilkins
Attribution
(required by the license)
InfoField
Jonathan Wilkins / New cycleway 3 / 
Jonathan Wilkins / New cycleway 3
Camera location53° 15′ 51.4″ N, 3° 57′ 36″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 15′ 51.4″ N, 3° 57′ 36″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing edit

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Jonathan Wilkins
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:51, 2 March 2011Thumbnail for version as of 05:51, 2 March 2011640 × 480 (83 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=New cycleway 3 The western ramp for the new cycle and footbridge shows the elevated course of the deck in the central reservation. Considerable new construction was necessary at this end, as can be

There are no pages that use this file.

Metadata