File:Post-IDA Hudson Line Renewal (51430308211).jpg
Original file (4,032 × 3,024 pixels, file size: 3.57 MB, MIME type: image/jpeg)
Captions
Summary edit
DescriptionPost-IDA Hudson Line Renewal (51430308211).jpg |
Following initial post-storm inspections and clearance of trees, vegetation and debris from the tracks, MTA crew members and contractors have spent more than 100 hours restoring slopes and ballast that had been washed out by floodwaters at multiple locations throughout the Hudson Line, installing 600 cubic yards of heavy stone fill to stabilize areas surrounding tracks for safe operation. Much of the work has been at Greystone, where waters cascaded down from Warburton Avenue creating a mudslide onto the tracks. Photo: Metropolitan Transportation Authority |
Date | |
Source | Post-IDA Hudson Line Renewal |
Author | Metropolitan Transportation Authority of the State of New York from United States of America |
Licensing edit
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by MTAPhotos at https://flickr.com/photos/61135621@N03/51430308211. It was reviewed on 11 September 2021 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
11 September 2021
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 03:24, 11 September 2021 | 4,032 × 3,024 (3.57 MB) | A1Cafel (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.