File:Pouring concrete for Diablo Dam construction, with man hanging from crane lines, using guidewire to direct concrete funnel (SPWS 252).jpg
Pouring_concrete_for_Diablo_Dam_construction,_with_man_hanging_from_crane_lines,_using_guidewire_to_direct_concrete_funnel_(SPWS_252).jpg (461 × 600 pixels, file size: 83 KB, MIME type: image/jpeg)
Captions
The categories of this image need checking. You can do so here.
|
This image was automatically transferred from the collections of the University of Washington. While certainly the majority of metadata in their database is correct, it is not necessarily written by individuals who are expert on the material they are describing. Such images often have incorrect dates, locations, or other information. If you can verify that this information is correct, or correct it if it isn't, please do so and remove this template. Also, if you are correcting information, please also let the library know so that they can update the metadata on their site. You can contact UW LIBRARIES MSCUA at photosuw.edu |
Summary
editEnglish: Pouring concrete for Diablo Dam construction, with man hanging from crane lines, using guidewire to direct concrete funnel, October 3, 1928 ( ) | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Photographer |
Unknown authorUnknown author |
|||||||||||||||||||||||
Title |
English: Pouring concrete for Diablo Dam construction, with man hanging from crane lines, using guidewire to direct concrete funnel, October 3, 1928 |
|||||||||||||||||||||||
Description |
English: Photographs of the Skagit River Hydroelectric Project constructed between 1918-1961.
The Diablo Dam was built by Seattle City Light at a location 7-1/2 miles upstream from Newhalem and completed August 27, 1930. Due to the Great Depression, the Diablo Powerhouse was not completed until 1935, with the first power being generated in 1936. Caption on image: D(28-10-3)6 Caption below image: Diablo Dam - Pouring concrete PH Coll 45.2-21
|
|||||||||||||||||||||||
Depicted place |
English: United States--Washington (State)--Skagit River--Diablo Dam |
|||||||||||||||||||||||
Date | Taken on 3 October 1928 | |||||||||||||||||||||||
Medium |
English: silver gelatin, b&w |
|||||||||||||||||||||||
Collection |
institution QS:P195,Q219563 |
|||||||||||||||||||||||
Current location | ||||||||||||||||||||||||
Accession number | ||||||||||||||||||||||||
Source | ||||||||||||||||||||||||
Permission (Reusing this file) |
|
|||||||||||||||||||||||
Order Number InfoField | WWDL0394 |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 05:49, 3 January 2024 | 461 × 600 (83 KB) | BMacZeroBot (talk | contribs) | Automatic lossless crop (watermark, horizontal) | |
05:49, 3 January 2024 | 768 × 630 (86 KB) | BMacZeroBot (talk | contribs) | Batch upload (Commons:Batch uploading/University of Washington Digital Collections) |
You cannot overwrite this file.