File:Preflight activities in Russia for next space station crew.webm

Original file(WebM audio/video file, VP9/Opus, length 7 min 32 s, 1,280 × 720 pixels, 2.66 Mbps overall, file size: 143.51 MB)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Expedition 46-47 Soyuz Commander Yuri Malenchenko of the Russian Federal Space Agency (Roscosmos), NASA Flight Engineer Tim Kopra and Flight Engineer Tim Peake of the European Space Agency, and their backups, Anatoly Ivanishin of Roscosmos, Kate Rubins of NASA and Takuya Onishi of the Japan Aerospace Exploration Agency visited the Gagarin Museum where they viewed historic space artifacts at the Gagarin Cosmonaut Training Center in Star City, Russia Nov. 23, then traveled to Moscow where they laid flowers at the Kremlin Wall in Red Square where Russian space icons are interred. Malenchenko, Kopra and Peake are scheduled to launch Dec. 15 in the Soyuz TMA-19M spacecraft to the International Space Station for a six-month mission.
Date
Source YouTube: Preflight activities in Russia for next space station crew – View/save archived versions on archive.org and archive.today
Author NASA

Licensing edit

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current20:11, 25 February 20167 min 32 s, 1,280 × 720 (143.51 MB)Ras67 (talk | contribs)User created page with UploadWizard

Transcode status

Update transcode status
Format Bitrate Download Status Encode time
VP9 720P 2.63 Mbps Completed 09:15, 14 October 2018 29 min 6 s
Streaming 720p (VP9) Not ready Unknown status
VP9 480P 1.38 Mbps Completed 09:08, 14 October 2018 22 min 8 s
Streaming 480p (VP9) Not ready Unknown status
VP9 360P 738 kbps Completed 08:59, 14 October 2018 14 min 11 s
Streaming 360p (VP9) Not ready Unknown status
VP9 240P 420 kbps Completed 09:09, 14 October 2018 23 min 26 s
Streaming 240p (VP9) 323 kbps Completed 14:19, 6 December 2023 3.0 s
WebM 360P 561 kbps Completed 12:01, 26 February 2016 52 min 48 s
Streaming 144p (MJPEG) 1 Mbps Completed 17:14, 19 November 2023 37 s
Stereo (Opus) 93 kbps Completed 08:35, 25 November 2023 8.0 s
Stereo (MP3) 128 kbps Completed 17:14, 19 November 2023 13 s