File:Sand and gravel storage bins under construction, Diablo Dam, March 16, 1928 (SPWS 251).jpg

Original file(768 × 618 pixels, file size: 94 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents


Summary

edit
English: Sand and gravel storage bins under construction, Diablo Dam, March 16, 1928   (Wikidata search (Cirrus search) Wikidata query (SPARQL)  Create new Wikidata item based on this file)
Photographer
Unknown authorUnknown author
Title
English: Sand and gravel storage bins under construction, Diablo Dam, March 16, 1928
Description
English: Photographs of the Skagit River Hydroelectric Project constructed between 1918-1961.

The Diablo Dam was built by Seattle City Light at a location 7-1/2 miles upstream from Newhalem and completed August 27, 1930. Due to the Great Depression, the Diablo Powerhouse was not completed until 1935, with the first power being generated in 1936.

Caption on image: D-28-3-16

Caption below image: Sand and gravel storage bins - under construction

PH Coll 45.2-19

  • Subjects (LCSH): Gravel--Washington (State); Sand--Storage--Washington (State); GravelDams--Washington (State)--Design and construction; Diablo Dam (Wash.)
Depicted place
English: United States--Washington (State)--Skagit River--Diablo Dam
Date Taken on 16 March 1928
Medium
English: silver gelatin, b&w
institution QS:P195,Q219563
Current location
Accession number
Source
Permission
(Reusing this file)
Public domain
This work is in the public domain in the United States because it was published (or registered with the U.S. Copyright Office) before January 1, 1929.
Order Number
InfoField
WWDL0393

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:49, 3 January 2024Thumbnail for version as of 05:49, 3 January 2024768 × 618 (94 KB)BMacZeroBot (talk | contribs)Batch upload (Commons:Batch uploading/University of Washington Digital Collections)