File:Seattle Mail and Herald, v. 8, no. 31, Jun. 17, 1905 - DPLA - e310e5025030268952cffdcb7877477d (page 1).jpg

Original file(4,035 × 5,379 pixels, file size: 2.04 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Seattle Mail and Herald, v. 8, no. 31, Jun. 17, 1905   (Wikidata search (Cirrus search) Wikidata query (SPARQL)  Create new Wikidata item based on this file)
Creator
InfoField
Nagel, Cora B; Bowman, C.E
Title
Seattle Mail and Herald, v. 8, no. 31, Jun. 17, 1905
Description

Page 1 features of photograph of railroad between Seattle and the City Lighting Plant.


The caption reads, "This railroad belongs to Seattle and leads to the City Lighting plant." In 1905, the only hydro plant owned by the city was on the Cedar River. No article in the 12-page issue that seems to elucidate that further, but Seattle historian Rob Ketcherside quotes the following from Public Works in Seattle, A Narrative History of the Engineering Department, 1875-1975 (1978) by Myra Phelps, emphasis (and, of course, links) not in original. On page 135: "The site for the [City Light] dam [chosen by R. H. Thomson] was located about a half mile below Cedar Lake (renamed Chester Morse Lake, 1956). The best bid on lumber for the dam and construction was $35 per thousand feet delivered at the rail head at North Bend. Two million feet of lumber was needed and the dam site was at least three miles further up the river valley from the rail head. Permission was secured to build a short railroad over which the Engineering crew hauled the necessary saw mill machinery by donkey engine to the power site at the end of the lake. The mill was set up and was used to cut the lumber for shelter for the workers, storage of the mill machinery and all the lumber that was needed for construction of the dam and the staves for the water pipe, doing this at about a third of the bid price; the mill was then sold at a profit. Engineer Thomson had a small crew to install electrical equipment for the power plant as it arrived, and in 1904, one of the generators was placed in operation."

Some of the geography of this may be clearer in this 1911 topographic map.
Date 17 June 1905
date QS:P571,+1905-06-17T00:00:00Z/11
institution QS:P195,Q7442157
Source/Photographer
Permission
(Reusing this file)
Public domain
Public domain
This media file is in the public domain in the United States. This applies to U.S. works where the copyright has expired, often because its first publication occurred prior to January 1, 1929, and if not then due to lack of notice or renewal. See this page for further explanation.

United States
United States
This image might not be in the public domain outside of the United States; this especially applies in the countries and areas that do not apply the rule of the shorter term for US works, such as Canada, Mainland China (not Hong Kong or Macao), Germany, Mexico, and Switzerland. The creator and year of publication are essential information and must be provided. See Wikipedia:Public domain and Wikipedia:Copyrights for more details.
Standardized rights statement
InfoField
No Copyright - United States

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:02, 19 August 2022Thumbnail for version as of 05:02, 19 August 20224,035 × 5,379 (2.04 MB)DPLA bot (talk | contribs)Uploading DPLA ID e310e5025030268952cffdcb7877477d