File:US Navy 090327-N-6357K-023 Military Construction Project 401 (MILCON P-401) Stakeholders break ground on the five year $139 million fuel facility replacement at Defense Fuel Support Point (DFSP) Loma at Naval Base Point Loma.jpg

Original file(2,100 × 1,500 pixels, file size: 471 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: SAN DIEGO, Calif. (March 27, 2009) Military Construction Project 401 (MILCON P-401) Stakeholders break ground on the five year $139 million fuel facility replacement at Defense Fuel Support Point (DFSP) Loma at Naval Base Point Loma. DFSP Point Loma is the only defense fuel facility in the Southern California region, providing fleet assets and airfields annually with fuel valued at $500M. Hering addressed the significance of this new facility to the region and the Navy. Military Construction Project 401 will construct six 125,000-barrel fuel storage tanks, associated piping, facility pump house, and a fuel oil reclamation facility at DFSP Point Loma, with an option to install two additional tanks. (U.S. Navy photo by Chief Mass Communication Specialist Yan M. Kennon/Released)
Date Taken on 27 March 2009
Source

This image was released by the United States Navy with the ID 090327-N-6357K-023 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author U.S. Navy photo by Chief Mass Communication Specialist Yan M. Kennon

Licensing edit

Public domain
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current10:28, 6 November 2009Thumbnail for version as of 10:28, 6 November 20092,100 × 1,500 (471 KB)BotMultichillT (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=SAN DIEGO, Calif. (March 27, 2009) Military Construction Project 401 (MILCON P-401) Stakeholders break ground on the five year $139 million fuel facility replacement at Defense Fuel Support Point (D

There are no pages that use this file.

Metadata