File:Wh slab after fire b4 hose2.jpg

Original file(5,903 × 4,042 pixels, file size: 8.16 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Warnock Hersey/Intertek 2 hour fie test of firestop mortar assembly. Slab was tilted 45° to enable hose-streaming onto the assembly and then straight into the hot furnace as the lab did not have appropriate lifting equipment to remove the assembly for the hose stream test.
Date
Source Own work
Author Achim Hering

Licensing edit

I, the copyright holder of this work, hereby publish it under the following licenses:
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Unported license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:51, 24 January 2010Thumbnail for version as of 06:51, 24 January 20105,903 × 4,042 (8.16 MB)Achim Hering (talk | contribs){{Information |Description={{en|1=Warnock Hersey/Intertek 2 hour fie test of firestop mortar assembly. Slab was tilted 45° to enable hose-streaming onto the assembly and then straight into the hot furnace as the lab did not have appropriate lifting equip

There are no pages that use this file.

Metadata