Home
Random
Nearby
Log in
Settings
Donate
About Wikimedia Commons
Disclaimers
Search
Category
:
East Side Access construction/2018/08/31
Language
Watch
Edit
<
Category:East Side Access construction
|
2018
|
08
Media in category "East Side Access construction/2018/08/31"
The following 26 files are in this category, out of 26 total.
A ballast regulator sweeping excess ballast off newly installed rail. (ESA LIRR, 08-25-2018) (43672644824).jpg
5,312 × 2,988; 6.03 MB
Backfilling & compacting soils under the Queens Blvd bridge for the future Mid-day storage yard. (CQ033, 08-28-2018) (44340220562).jpg
1,512 × 2,016; 573 KB
Backfilling a sewer line for the future Mid-day storage yard. (CQ033, 08-29-2018) (43672641604).jpg
1,224 × 1,632; 937 KB
Backfilling the foundation for the cart storage building that will service the Mid-day storage yard. (CQ033, 08-27-2018) (43672641224).jpg
4,032 × 3,024; 4.1 MB
Cleaning newly installed rail in the lower level of the west cavern.(CM007, 08-28-18) (43481602275).jpg
3,024 × 4,032; 1.57 MB
Column inspection in the future LIRR passenger concourse. (CM014B, 08-2018 ) (43337514435).jpg
4,032 × 3,024; 1.85 MB
Conduit installation under the passenger platform in the east cavern. (CM007, 08-28-2018) (44340218452).jpg
4,608 × 2,592; 2.11 MB
Crane mobilized to 37th Avenue in Queens to assist with the installation of a new switch. (ESA LIRR, 08-25-2018) (43481608705).png
1,504 × 1,000; 3.11 MB
Crane mobilized to 37th Avenue in Queens to assist with the installation of a new switch. (ESA LIRR, 08-25-2018) (43481609385).jpg
4,032 × 3,024; 2.11 MB
Fabrication of grout pads for the ventilation fans in the fan room of a power substation. (CS179, 08-28-2018) (43672642504).jpg
4,608 × 3,456; 2.47 MB
Formed & poured concrete for a ductbank east of Queens Blvd. (CQ033, 08-28-2018) (44340220682).jpg
1,224 × 1,632; 706 KB
Installation of 15kV power feed cables that will connect to a transformer room of a power substation located in Queens. (CS179, 08-28-2018) (30521919718).jpg
4,608 × 3,456; 7.38 MB
Installing hangers for piping along the east service corridor of the future LIRR concourse. (CM014B, 08-30-2018) (44340219192).jpg
3,264 × 2,448; 2.49 MB
Looking east on Main Line 1 track towards the newly installed switch. (ESA LIRR, (08-25-2018) (43672644014).jpg
5,312 × 2,312; 5.1 MB
Marble finishes installed in Men's bathroom of the future LIRR concourse. (CM014B, 08-28-2018) (43481603335).jpg
3,264 × 2,448; 1.75 MB
Passenger elevator steel frame installed in the west cavern. (CM007, 08-27-2018) (44340218162).jpg
4,032 × 3,024; 3.72 MB
Patching the high bench of the Track A approach structure. (CH061A, 08-27-18) (44389431251).jpg
1,512 × 2,016; 929 KB
Patching the north wall of the Tunnel A approach structure. (CH061A, 08-27-18) (29452664427).jpg
1,512 × 2,016; 808 KB
Pouring ballast for the new track installed between 43rd and 48th Streets in Sunnyside. (CH057D, 08-26-2018) (44389429171).jpg
1,512 × 2,016; 551 KB
Power feed and control wire installation in a power substation located in Queens. (CS179, 08-15-18) (43525957634).jpg
4,608 × 3,456; 3 MB
Preparing a manhole for installation for the future Mid-day storage yard. (CQ033, 08-29-2018) (43672641414).jpg
2,016 × 1,512; 931 KB
Removal of an existing concrete ductbank west of the 39th Street bridge. (CH061A, 08-17-18) (43337508575).jpg
960 × 1,280; 600 KB
Surfacing the new Main Line 1 track between 43rd and 48th Streets in Sunnyside. (CH057D, 08-25-2018) (44389429341).jpg
1,512 × 2,016; 1.37 MB
Transformer installation in the electrical room of the Yard Services Building located in Queens. (CS179, 08-29-2018) (43672643054).jpg
4,608 × 3,456; 2.72 MB
Upper level precast concrete platform walls installed in the west cavern. (CM007, 08-29-2018) (44340217932).jpg
4,032 × 3,024; 3.91 MB
Welding a pipe for new conduits in the future LIRR passenger concourse. (CM014B, 08-30-2018) (44340219022).jpg
3,264 × 2,448; 1.07 MB