Category:East Side Access construction/2019/01/18
Media in category "East Side Access construction/2019/01/18"
The following 33 files are in this category, out of 33 total.
-
Painting the passenger elevator in the east cavern. (CM007, 01-16-2019) (39823982163).jpg 4,032 × 3,024; 4.18 MB
-
Passenger escalator installation in the west cavern. (CM007, 01-17-2019) (39823982813).jpg 4,032 × 3,024; 3.96 MB
-
Sprinkler installation in the future LIRR concourse. (CM014B, 01-17-2019) (39823983703).jpg 3,264 × 2,448; 1.66 MB