Category:East Side Access construction/2019/05/31
Media in category "East Side Access construction/2019/05/31"
The following 22 files are in this category, out of 22 total.
-
Installing tile finishes in the passenger concourse. 05-30-2019 (47974572793).jpg 2,448 × 3,264; 1.9 MB
-
Installing tyrek at the existing 47th Street stairwell. 05-29-2019 (47974560557).jpg 3,024 × 4,032; 2.29 MB