Category:Solid Stage Assembly Building
Media in category "Solid Stage Assembly Building"
The following 22 files are in this category, out of 22 total.
-
GSLV F11- Vehicle being moved from Solid Stage Assembly Building at SDSC SHAR.jpg 3,680 × 2,456; 1.02 MB
-
GSLV Mk III M1, Chandrayaan-2 - Hoisting of slanted nose cone of S200 solid booster.jpg 4,912 × 7,360; 23.5 MB
-
GSLV Mk III M1, Chandrayaan-2 - L110 stage integrated with S200 solid booster strapons.jpg 4,912 × 7,360; 2.98 MB
-
GSLV-F10, EOS-3 - Core base segment being placed on MLP.jpg 4,912 × 7,360; 27.66 MB
-
GSLV-F10, EOS-3 - Core middle segment being hoisted.jpg 4,912 × 7,360; 29.1 MB
-
GSLV-F10, EOS-3 - Core middle segment being placed over base segment.jpg 4,912 × 7,360; 23.02 MB
-
GSLV-F10, EOS-3 - Liquid strapon L40 being hoisted for integration.jpg 4,912 × 7,360; 22.88 MB
-
GSLV-F10, EOS-3 - Liquid strapons being integrated with solid core.jpg 4,912 × 7,360; 24.06 MB
-
GSLV-F10, GISAT-1- First stage being integrated.jpg 2,947 × 4,416; 1.81 MB
-
GSLV-F10, GISAT-1- GS1+GS2 stack being transferred from SSAB.jpg 3,680 × 2,456; 1.04 MB
-
LVM3 M2, OneWeb India-1 campaign 08.jpg 5,472 × 3,648; 1.06 MB
-
PSLV C45 EMISAT campaign 04.jpg 2,456 × 3,680; 1.1 MB
-
PSLV C45 EMISAT campaign 05.jpg 2,456 × 3,680; 1.1 MB
-
PSLV C47 Cartosat-3 integration process 004.jpg 2,620 × 3,925; 1.36 MB
-
PSLV C47 Cartosat-3 integration process 005.jpg 3,930 × 5,888; 2.29 MB
-
PSLV-C11 Strapon01.jpg 1,024 × 679; 157 KB
-
PSLV-C11 Strapon02.jpg 480 × 722; 123 KB
-
PSLV-C50, CMS-01- Fully integrated stack of S139 first stage.jpg 3,648 × 5,472; 1.19 MB