No.
|
File
|
Categorized?
|
1
|
Rock fill being made at Sta. 78 during high tide period. Stakes at right are at toe of slope. Center line stakes in... - NARA - 298220.tif
|
|
2
|
View shows in foreground rock fill slope protection at about Sta.75. Line of high stakes at toe of fill slope low... - NARA - 298221.tif
|
|
3
|
View shows blast at high rock cut, Sta. 65-50, blocking existing road for 8 hours, hence detour road at about Sta. 72. - NARA - 298222.tif
|
|
4
|
View shows wagon drill used in preparations to shoot rock point, Stas. 63-67. - NARA - 298223.tif
|
|
5
|
Equipment used in punching holes along shoulder edge for concrete posts of guard rail. Equipment in Novo Pavement... - NARA - 298224.tif
|
|
6
|
View shows general lay of the ground where the heavy excavationis involved. Also the evident problem of handling... - NARA - 298227.tif
|
|
7
|
View shows how shovel is operated along existing road to load material pushed over by bulldozer near top of cut.... - NARA - 298226.tif
|
|
8
|
View from top of "down" road with fill area in background, drainage, ditch, etc. End of grade, hydraulic fill, in... - NARA - 298228.tif
|
|
9
|
General view to show heavy cuts involved in the work. Material consists of clay, loam and rock. No rock yet required... - NARA - 298229.tif
|
|
10
|
View shows method of excavating high cuts. Cutting at top done by D8 cat. with rooter and bulldozer attachments.... - NARA - 298230.tif
|
|
11
|
1-1-2 yard shovel in center loading 20-yd. Dumpster trucks. Cat. (D8) with 20-yd. carryall scraper on "up" road.... - NARA - 298231.tif
|
|
12
|
Gravel surfacing looking north from Station 220 - NARA - 298234.tif
|
|
13
|
Gravel screening and crushing plant at Station A95-00 - NARA - 298233.tif
|
|
14
|
View looking north from Station 871 showing hydraulic fill material in place and 90^ completed. 15" pipe line from... - NARA - 298235.tif
|
|
15
|
View looking north showing 15" suction dredge excavating at channel changge of Lewis River, at right of Station 848... - NARA - 298236.tif
|
Done
|
16
|
View looking north at Station 895 showing hydraulic fill under construction. Temporary dikes built at sides from... - NARA - 298237.tif
|
|
17
|
Station 122 Looking north - retaining wall - NARA - 298239.tif
|
|
18
|
Rock fill being made at Sta. 78 during high tide period. Stakes at right are at toe of slope. Center line stakes in... - NARA - 298220.jpg
|
Done
|
19
|
View shows in foreground rock fill slope protection at about Sta.75. Line of high stakes at toe of fill slope low... - NARA - 298221.jpg
|
Done
|
20
|
View shows blast at high rock cut, Sta. 65-50, blocking existing road for 8 hours, hence detour road at about Sta. 72. - NARA - 298222.jpg
|
|
21
|
View shows wagon drill used in preparations to shoot rock point, Stas. 63-67. - NARA - 298223.jpg
|
|
22
|
Equipment used in punching holes along shoulder edge for concrete posts of guard rail. Equipment in Novo Pavement... - NARA - 298224.jpg
|
Done
|
23
|
View shows general lay of the ground where the heavy excavationis involved. Also the evident problem of handling... - NARA - 298227.jpg
|
|
24
|
View shows how shovel is operated along existing road to load material pushed over by bulldozer near top of cut.... - NARA - 298226.jpg
|
|
25
|
View from top of "down" road with fill area in background, drainage, ditch, etc. End of grade, hydraulic fill, in... - NARA - 298228.jpg
|
|
26
|
General view to show heavy cuts involved in the work. Material consists of clay, loam and rock. No rock yet required... - NARA - 298229.jpg
|
|
27
|
View shows method of excavating high cuts. Cutting at top done by D8 cat. with rooter and bulldozer attachments.... - NARA - 298230.jpg
|
|
28
|
1-1-2 yard shovel in center loading 20-yd. Dumpster trucks. Cat. (D8) with 20-yd. carryall scraper on "up" road.... - NARA - 298231.jpg
|
|
29
|
Gravel surfacing looking north from Station 220 - NARA - 298234.jpg
|
|
30
|
Gravel screening and crushing plant at Station A95-00 - NARA - 298233.jpg
|
|
31
|
View looking north from Station 871 showing hydraulic fill material in place and 90^ completed. 15" pipe line from... - NARA - 298235.jpg
|
|
32
|
View looking north showing 15" suction dredge excavating at channel changge of Lewis River, at right of Station 848... - NARA - 298236.jpg
|
|
33
|
View looking north at Station 895 showing hydraulic fill under construction. Temporary dikes built at sides from... - NARA - 298237.jpg
|
|
34
|
Station 122 Looking north - retaining wall - NARA - 298239.jpg
|
|