File:132134 MAIN LOW PRESSURE HEATING LANKERSHAM BOILER PLANT AFTER THE FINAL PHASES OF "OPERATION LEWISITE" WHICH WAS CARRIED OUT UNDER THE DIRECTION OF THE DIRECTOR OF ENGINEERING EQUIPMENT, BCOF.JPG
132134_MAIN_LOW_PRESSURE_HEATING_LANKERSHAM_BOILER_PLANT_AFTER_THE_FINAL_PHASES_OF_"OPERATION_LEWISITE"_WHICH_WAS_CARRIED_OUT_UNDER_THE_DIRECTION_OF_THE_DIRECTOR_OF_ENGINEERING_EQUIPMENT,_BCOF.JPG (640 × 413 pixels, file size: 191 KB, MIME type: image/jpeg)