File:1979 MBTA Commuter Rail map.png
![File:1979 MBTA Commuter Rail map.png](https://upload.wikimedia.org/wikipedia/commons/thumb/a/a1/1979_MBTA_Commuter_Rail_map.png/598px-1979_MBTA_Commuter_Rail_map.png?20200611201533)
Original file (976 × 979 pixels, file size: 1.59 MB, MIME type: image/png)
Captions
Captions
Summary
editDescription1979 MBTA Commuter Rail map.png |
English: A 1979 map of the MBTA Commuter Rail system. The November 1979 changes for Southwest Corridor construction are shown, as are the January 1980 extensions to Gardner and Concord. However, the December 1979 extension to Haverhill is shown as not yet completed; it shows never-opened stations at North Andover and Rosemont, plus a never-opened branch to Methuen. |
||||||||
Date | |||||||||
Source |
|
||||||||
Author | Massachusetts Bay Transportation Authority | ||||||||
Permission (Reusing this file) |
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 20:15, 11 June 2020 | ![]() | 976 × 979 (1.59 MB) | Pi.1415926535 (talk | contribs) | File:1980 MBTA system map reverse.png cropped 72 % horizontally, 68 % vertically using CropTool with precise mode. |
You cannot overwrite this file.
File usage on Commons
The following 4 pages use this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
File change date and time | 20:10, 11 June 2020 |
---|