File:2017 at Bath Spa - rebuilding platform 2 (3).JPG

Original file(1,366 × 910 pixels, file size: 549 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Bath Spa station was rebuilt during April 2017. The first phase involved work on platform 1 where materials could be brought on site from the old mail handling area which is connected to the down side car park by a ramp. But now work has switched to platform 2 and materials have to be hauled up to track level from the road outside the Royal Mail sorting office by way of this temporary scaffold structure.
Date
Source Own work
Author Geof Sheppard

Licensing edit

I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current12:25, 23 April 2017Thumbnail for version as of 12:25, 23 April 20171,366 × 910 (549 KB)Geof Sheppard (talk | contribs){{Information |Description ={{en|1=Bath Spa station was rebuilt during April 2017. The first phase involved work on platform 1 where materials could be brought on site from the old mail handling area which is connected to the down side car park by a...

Metadata