File:2018 at Filton Abbey Wood - the four tracks now in place (11).JPG

Original file(1,366 × 820 pixels, file size: 391 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: When Filton Abbey Wood station opened in 1996 there were just two tracks served by platforms 1 and two (on the right in this view). Platform 3 was opened in 2004 to allow Cardiff-bound services to call without blocking the main line to the north. 2018 saw the widening of the line souhwards to Bristol to four tracks and so a platform 4 was added (on the far left).
Date
Source Own work
Author Geof Sheppard

Licensing edit

I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:57, 23 December 2018Thumbnail for version as of 08:57, 23 December 20181,366 × 820 (391 KB)Geof Sheppard (talk | contribs){{Information |description ={{en|1=When Filton Abbey Wood station opened in 1996 there were just two tracks served by platforms 1 and two (on the right in this view). Platform 3 was opened in 2004 to allow Cardiff-bound services to call without blocking the main line to the north. 2018 saw the widening of the line souhwards to Bristol to four tracks and so a platform 4 was added (on the far left).}} |date =2018-12-15 |source ={{own}} |author =User:Geof Sheppard }...

File usage on other wikis

The following other wikis use this file:

Metadata