English: Last of the major construction work had been completed last week, which meant service at the new tram/bus interchange at Madlow could commence on 2019-12-16. Further work is required, such as installing the remaining glass panels of the bicycle shelters, but nothing which would interfere with regular operation.

The intersection with Madlower Hauptstraße, while protected by an additional set of traffic lights, is a somewhat compromised layout constrained by the limited space available.
Date
Source Own work
Author Trio3D
Camera location51° 43′ 16.68″ N, 14° 20′ 45.58″ E  Heading=135° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:13, 17 December 2019Thumbnail for version as of 09:13, 17 December 20193,000 × 1,987 (9.98 MB)Trio3D (talk | contribs){{Information |description ={{en|1=Last of the major construction work had been completed last week, which meant service at the new tram/bus interchange at Madlow could commence on 2019-12-16. Further work is required, such as installing the remaining glass panels of the bicycle shelters, but nothing which would interfere with regular operation.<br><br>The intersection with Madlower Hauptstraße, while protected by an additional set of traffic lights, is a somewhat compromised layout constra...

File usage on other wikis

The following other wikis use this file:

  • Usage on de.wikipedia.org