File:2021 at Coastguards footbridge (03) building the new sea wall.JPG

Original file(1,366 × 910 pixels, file size: 778 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Engineers are extending the high level walkway along the sea wall from the Coastguard's footbridge at Dawlish to meet up with the new section on the other side of the station. This will better protect the railway from high seas and also make it safer for walkers.
Date
Source Own work
Author Geof Sheppard

Licensing edit

I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current20:20, 7 August 2021Thumbnail for version as of 20:20, 7 August 20211,366 × 910 (778 KB)Geof Sheppard (talk | contribs){{Information |Description={{en|1=Engineers are extending the high level walkway along the sea wall from the Coastguard's footbridge at Dawlish to meet up with the new section on the other side of the station. This will better protect the railway from high seas and also make it safer for walkers.}} |Source={{own}} |Date= 2021-08-01 |Author= Geof Sheppard |Permission= |other_versions= }} 2021-08-01 [[Category:Coastguard...

Metadata