File:5n PERT graph with critical path2.svg
![File:5n PERT graph with critical path2.svg](https://upload.wikimedia.org/wikipedia/commons/thumb/f/fe/5n_PERT_graph_with_critical_path2.svg/353px-5n_PERT_graph_with_critical_path2.svg.png?20070113192935)
Size of this PNG preview of this SVG file: 353 × 198 pixels. Other resolutions: 320 × 179 pixels | 640 × 359 pixels | 1,024 × 574 pixels | 1,280 × 718 pixels | 2,560 × 1,436 pixels.
Original file (SVG file, nominally 353 × 198 pixels, file size: 4 KB)
File information
Structured data
Captions
Captions
Add a one-line explanation of what this file represents
Description5n PERT graph with critical path2.svg | The graph was created with Graphviz from the graph specification below. |
Date | |
Source | Own work |
Author | hu:User:Illes |
Permission (Reusing this file) |
The image is in the public domain. |
digraph untitl { node [ fontname="Helvetica-Bold", shape="circle", width="0.3", fontsize="12", style ="setlinewidth(2),filled" color="black", fillcolor = "pink"]; edge [ fontname="Helvetica-Bold", fontsize="18", style="bold" ]; graph [ rankdir="LR", ranksep="0.4"]; { rank = same; B; D } A -> B [ label = "3", color="red"]; B -> C [ label = "2"]; B -> E [ label = "1", color="red"]; E -> C [ label = "3", color="red"]; A -> D [ label = "2"]; D -> C [ label = "3"]; }
Public domainPublic domainfalsefalse |
![]() |
This work is ineligible for copyright and therefore in the public domain because it consists entirely of information that is common property and contains no original authorship. |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 19:29, 13 January 2007 | ![]() | 353 × 198 (4 KB) | Illes (talk | contribs) | {{Information| |Description = The graph was created with Graphviz from the graph specification below. |Source = own work |Date = January 12, 2007 |Author = hu:User:Illes |Permission = The image is in the public domain. |other_versions = - }} <pre> |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
File usage on other wikis
The following other wikis use this file:
- Usage on es.wikipedia.org
- Usage on hr.wikipedia.org
- Usage on hu.wikipedia.org