File:Barmouth Bridge Renovation DSC 3025c-Edit.jpg

Original file(1,500 × 1,001 pixels, file size: 243 KB, MIME type: image/jpeg)

Captions

Captions

Barge carrying new section for the bridge awaiting instructions

Summary

edit
Description
English: ** This autumn, we will carefully reconstruct the metal sections of the bridge. We will also renew the tracks near to Barmouth Toll House, on the northern edge of the viaduct.

This includes removing the two old metallic spans, which weigh 160-tonnes, each. Due to the complexities and challenges of this task, a mock manoeuvre was recently carried out to streamline the process ahead of the real move, this Autumn.

    • Info courtesy Network Rail
Date
Source Own work
Author Talsarnau Times

Licensing

edit
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current07:45, 1 November 2023Thumbnail for version as of 07:45, 1 November 20231,500 × 1,001 (243 KB)Talsarnau Times (talk | contribs)Uploaded own work with UploadWizard

The following page uses this file:

Metadata