File:Bundesarchiv Bild 183-P1001-0016, Gera, Bauarbeiter.jpg
Size of this preview: 542 × 599 pixels. Other resolutions: 217 × 240 pixels | 578 × 639 pixels.
Original file (578 × 639 pixels, file size: 54 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
editPhotographer |
Liebers, Peter |
||||||||||||||||||||||||||
Original caption |
For documentary purposes the German Federal Archive often retained the original image captions, which may be erroneous, biased, obsolete or politically extreme. Gera, Bauarbeiter
ADN-ZB Liebers-1.10.75 Bez. Gera: Sie steuern die neuen Montagetechnologie, wo mittels einer Anordnung druckgesteuerter Luftpolster im neuen Zellstoffwerk Blankenstein über 100 Tonnen schwere Teile bewegt werden. Hier wird ein insgesamt über 60 Meter hoher Zellstoffkocher gebaut. Früher wurden bei der Montage solcher Aggregate eine Vielzahl kleiner Teile an Ort und Stelle montiert. Nach der neuen Technologie werden mehrere große Baugruppen in der Nähe des künftigen Standortes zusammengesetzt. Udo Müller, technischer Leiter im VEB Schwertransport Leipzig, Fritz Kutscher under der geistige Vater der neuen Technologie , Ingenieur Christian Zschocke (vlnr) - hier beim Absenken einer Sektion auf Luftkissen - erreichen mit dem neuen Verfahren einen Zeitgewinn in der Montage von mehr als sechs Monaten. Vergleich dazu auch ADN-Meld. vom 1.10.75 P 1001-15N) |
||||||||||||||||||||||||||
Depicted place | Gera | ||||||||||||||||||||||||||
Date |
1 October 1975 date QS:P571,+1975-10-01T00:00:00Z/11 |
||||||||||||||||||||||||||
Collection |
institution QS:P195,Q685753 |
||||||||||||||||||||||||||
Current location |
Allgemeiner Deutscher Nachrichtendienst - Zentralbild (Bild 183) |
||||||||||||||||||||||||||
Accession number | |||||||||||||||||||||||||||
Source |
|
Licensing
editThis file is licensed under the Creative Commons Attribution-Share Alike 3.0 Germany license.
Attribution: Bundesarchiv, Bild 183-P1001-0016 / CC-BY-SA 3.0
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:08, 13 April 2009 | 578 × 639 (54 KB) | Cropbot (talk | contribs) | upload cropped version, operated by User:Yarnalgo. Summary: removed white space and caption | |
17:57, 4 December 2008 | 605 × 800 (59 KB) | BArchBot (talk | contribs) | == Summary == {{Information |Description={{de|1='''Gera, Bauarbeiter''' ADN-ZB Liebers-1.10.75 Bez. Gera: Sie steuern die neuen Montagetechnologie, wo mittels einer Anordnung druckgesteuerter Luftpolster im neuen Zellstoffwerk Blankenstein über 100 Ton |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | ADN-ZB Liebers-1.10.75 Bez. Gera: Sie steuern die neuen Montagetechnologie, wo mittels einer Anordnung druckgesteuerter Luftpolster im neuen Zellstoffwerk Blankenstein über 100 Tonnen schwere Teile bewegt werden. Hier wird ein insgesamt über 60 Meter hoher Zellstoffkocher gebaut. Früher wurden bei der Montage solcher Aggregate eine Vielzahl kleiner Teile an Ort und Stelle montiert. Nach der neuen Technologie werden mehrere große Baugruppen in der Nähe des künftigen Standortes zusammengesetzt. Udo Müller, technischer Leiter im VEB Schwertransport Leipzig, Fritz Kutscher under der geistige Vater der neuen Technologie , Ingenieur Christian Zschocke (vlnr) - hier beim Absenken einer Sektion auf Luftkissen - erreichen mit dem neuen Verfahren einen Zeitgewinn in der Montage von mehr als sechs Monaten. Vergleich dazu auch ADN-Meld. vom 1.10.75 P 1001-15N) |
---|---|
Headline | Gera, Bauarbeiter |
Author | Liebers, Peter |
Credit/Provider | Bundesarchiv |
Short title | Bild 183-P1001-0016 |
Date and time of data generation | 1 October 1975 |
IIM version | 2 |