File:Completed Turbine Tower No 23 on Scout Moor - geograph.org.uk - 837335.jpg

Completed_Turbine_Tower_No_23_on_Scout_Moor_-_geograph.org.uk_-_837335.jpg(640 × 480 pixels, file size: 40 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description
English: Completed Turbine Tower No 23 on Scout Moor. June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end.

At 13:00 the very last blade was attached to Turbine No 23 above. Had the blade been attached just a few hours earlier in the morning it would have been in thick fog and not possible to photograph. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008. 837319 837293 837229 837248 696963 824546

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex

Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Completed Turbine Tower No 23 on Scout Moor / 
Paul Anderson / Completed Turbine Tower No 23 on Scout Moor
Camera location53° 39′ 57″ N, 2° 15′ 46″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

edit
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:58, 20 February 2011Thumbnail for version as of 18:58, 20 February 2011640 × 480 (40 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Completed Turbine Tower No 23 on Scout Moor June the 7th 2008 was an historic day on Scout Moor as construction of the wind farm came to an end. At 13:00 the very last blade was attached to Turbine

There are no pages that use this file.

Metadata