File:Dynamic Test Facility with Shuttle in place for testing.jpg

Original file(2,242 × 2,852 pixels, file size: 619 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description
English: Dynamic Test Facility with Shuttle in place for testing. Enterprise arrived at Marshall March 13, 1978 and shortly afterward was assembled into a full stack for vibration testing. This was the first assembly of a Space Shuttle stack.
Date
Source http://pdfhost.focus.nps.gov/docs/NHLS/Photos/85002806.pdf
Author NASA

Licensing

edit
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current21:16, 21 February 2012Thumbnail for version as of 21:16, 21 February 20122,242 × 2,852 (619 KB)Ke4roh (talk | contribs)