File:East Side Access tunneling 2012-09-20 8.jpg

Original file(1,224 × 1,632 pixels, file size: 663 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents
Camera location40° 45′ 06″ N, 73° 56′ 03.6″ W  Heading=336.025974° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Summary

edit
Description
English: On Sept. 20, 2012, sandhogs working on the East Side Access project broke through the last piece of wall separating the Manhattan tunnel from the Queens tunnel, thereby taking a big step toward a contiguous tunnel more than 3.5 miles long from Sunnyside Yard in Queens to 37th Street and Park Avenue in Manhattan
Date
Source Flickr – MTA photos, East Side Access Tunneling Break-Through, Sept. 20, 2012 set
Author Metropolitan Transportation Authority of New York (Jeannie Kwon)
Permission
(Reusing this file)
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image, originally posted to Flickr, was reviewed on 23 September 2012 by the administrator or reviewer Sven Manguard, who confirmed that it was available on Flickr under the stated license on that date.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:57, 23 September 2012Thumbnail for version as of 14:57, 23 September 20121,224 × 1,632 (663 KB)Hurricanefan24 (talk | contribs)User created page with UploadWizard

The following page uses this file:

Metadata