File:Histon - geograph-5416939-by-N-Chadwick.jpg

Histon_-_geograph-5416939-by-N-Chadwick.jpg(640 × 426 pixels, file size: 57 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description
English: Old Station House
Funding for the 'Guided Busway' was first applied for in July 2002. Cambridgeshire was awarded £92.5 million. By 2009 the estimated cost was put at £116.27million, in 2010 this estimate had risen to £161.0 million. By the end of 2010 the overall cost of this much delayed project was put at £180+ million. Early photos taken during the construction phase were first taken in December 2007, it opened on 7 August 2011.
Date
Source From geograph.org.uk
Author N Chadwick
Permission
(Reusing this file)
Creative Commons Attribution Share-alike license 2.0
Attribution
(required by the license)
InfoField
N Chadwick / Old Station House / 
N Chadwick / Old Station House
Camera location52° 14′ 31.6″ N, 0° 06′ 40″ E  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location52° 14′ 32.6″ N, 0° 06′ 37″ E  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

edit
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: N Chadwick
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current23:07, 23 November 2020Thumbnail for version as of 23:07, 23 November 2020640 × 426 (57 KB)Lamberhurst (talk | contribs)== {{int:filedesc}} == {{Information |Description={{en|1=<b>Old Station House</b><br>Funding for the 'Guided Busway' was first applied for in July 2002. Cambridgeshire was awarded £92.5 million. By 2009 the estimated cost was put at £116.27million, in 2010 this estimate had risen to £161.0 million. By the end of 2010 the overall cost of this much delayed project was put at £180+ million. Early photos taken during the construction phase were first taken in December 2007, it opened on 7 August...

There are no pages that use this file.