File:Node 2 Berthing Timeline.jpg

Original file(1,696 × 1,231 pixels, file size: 313 KB, MIME type: image/jpeg)

Captions

Captions

A highlighted timeline of ISS Node 2 berthing during STS-120 (ISS stage 10A)

Summary

edit
Description
English: Screenshot from page 5 (pdf pagination) of the source, highlighted to show the actions for the RMS and CBM operators. Page 4 indicates that the Powered Bolt commands were issued by the Operations Support Officer (OSO) on the ground in the gap between 2nd stage capture and pressurization of the vestibule.
Date
Source https://www.nasa.gov/pdf/194491main_fd04exec.pdf
Author NASA

Licensing

edit
Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:14, 8 May 2020Thumbnail for version as of 17:14, 8 May 20201,696 × 1,231 (313 KB)Not fred999 (talk | contribs)Fixed the erroneous highlighting of a Malenchenko exercise period.~~~~
17:16, 5 May 2020Thumbnail for version as of 17:16, 5 May 20201,696 × 1,231 (313 KB)Not fred999 (talk | contribs)Added tasking for the Centerline Boresight Camera System (CBCS).~~~~
19:29, 4 May 2020Thumbnail for version as of 19:29, 4 May 20201,696 × 1,231 (313 KB)Not fred999 (talk | contribs)Added a previously missed tasking assignment.~~~~
19:26, 2 May 2020Thumbnail for version as of 19:26, 2 May 20201,696 × 1,231 (313 KB)Not fred999 (talk | contribs)Uploaded a work by NASA from https://www.nasa.gov/pdf/194491main_fd04exec.pdf with UploadWizard

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file: