File:Pipeline Bridge 503 - under construction.jpg

Original file(5,152 × 2,896 pixels, file size: 6.67 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description
中文:金沙江上正在修建的观音岩引水工程503管桥。桥名源于附近早已拆除的503电厂。
English: Pipeline Bridge 503 (503管桥) under construction over Jinsha River. It is a part of the Guanyinyan water diversion project. The bridge got its name from a nearby fossil fuel power plant named "Power Plant 503" which is underground and has been removed several years ago.
Date
Source Own work
Author Zhangzj cet
Camera location26° 35′ 04.19″ N, 101° 39′ 21.59″ E Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

edit
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current12:29, 18 November 2016Thumbnail for version as of 12:29, 18 November 20165,152 × 2,896 (6.67 MB)Zhangzj cet (talk | contribs)User created page with UploadWizard

There are no pages that use this file.

Metadata