File:Pneumatic Underground Piercing.jpg

Original file(4,500 × 3,000 pixels, file size: 7.02 MB, MIME type: image/jpeg)

Captions

Captions

Laying of ducts for fiber optic cables using the soil displacement method

Summary

edit
Description
Deutsch: Verlegung von Leerrohren für Lichtwellenleiter (orange) im Bodenverdrängungsverfahren in Mannheim-Almenhof. Der Bodenverdrängungshammer, auch Erdrakete genannt, an den hinten ein Druckluftschlauch angeschlossen ist, kommt zu Füßen des Arbeiters soeben von rechts in der Zielgrube an.
English: Laying of ducts for fiber optic cables (orange) using the soil displacement method in Mannheim-Almenhof (Germany). The soil displacement hammer, also called earth rocket or mole, to which a compressed air hose is connected at the rear, arrives from the right in the target pit at the worker's feet.
Date
Source Own work
Author Hubert Berberich (HubiB)
Permission
(Reusing this file)

Foto: Hubert Berberich Wikimedia Commons (CC-BY-4.0)

Deutsch: Das Bild ist bewusst so fotografiert. Falls Du es hier in Commons ändern willst, ändere bitte nicht dieses Bild, sondern lege eine Kopie an, die sich auf dieses Bild bezieht!
English: This picture is deliberately made the way it is. If you want to change it here in Commons, please do not change this picture, but make a copy referring to this picture!
Camera location49° 27′ 44.14″ N, 8° 28′ 51.4″ E Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

edit
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current14:08, 3 April 2022Thumbnail for version as of 14:08, 3 April 20224,500 × 3,000 (7.02 MB)HubiB (talk | contribs)== {{int:filedesc}} == {{Information |Description = {{de|Verlegung von Lehrrohren für Lichtwellenleiter (orange) im Bodenverdrängungsverfahren in Mannheim-Almenhof. Der Bodenverdrängungshammer, auch Erdrakete genannt, an den hinten ein Druckluftschlauch angeschlossen ist, kommt zu Füßen des Arbeiters soeben von rechts in der Zielgrube an. }} {{en|Laying of ducts for fiber optic cables (orange) using the soil displacement method in Mannheim-Almenhof (Germany). The soil displacement hammer, al...

The following page uses this file:

File usage on other wikis

The following other wikis use this file:

Metadata