File:Point of Ayr Gas Terminal - geograph.org.uk - 674762.jpg
Point_of_Ayr_Gas_Terminal_-_geograph.org.uk_-_674762.jpg (640 × 480 pixels, file size: 81 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary edit
DescriptionPoint of Ayr Gas Terminal - geograph.org.uk - 674762.jpg |
English: Point of Ayr Gas Terminal This terminal, owned by BHP Billiton Petroleum, processes gas extracted by the Liverpool Bay platforms via a 33 km subsea pipeline. The gas is then supplied to the Powergen combined cycle gas turbine (CCGT) power station, which went into operation at Connah's Quay in July 1996. |
Date | |
Source | From geograph.org.uk |
Author | Eirian Evans |
Attribution (required by the license) InfoField | Eirian Evans / Point of Ayr Gas Terminal / |
InfoField | Eirian Evans / Point of Ayr Gas Terminal |
Camera location | 53° 20′ 56″ N, 3° 19′ 01″ W | View this and other nearby images on: OpenStreetMap | 53.348800; -3.317000 |
---|
Object location | 53° 20′ 49″ N, 3° 19′ 01″ W | View this and other nearby images on: OpenStreetMap | 53.347000; -3.317000 |
---|
Licensing edit
This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Eirian Evans and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Eirian Evans
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:57, 7 February 2011 | 640 × 480 (81 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Point of Ayr Gas Terminal This terminal, owned by BHP Billiton Petroleum, processes gas extracted by the Liverpool Bay platforms via a 33 km subsea pipeline. The gas is then supplied to the Powergen |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
File usage on other wikis
The following other wikis use this file:
- Usage on fa.wikipedia.org
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|