File:Powerhouse excavation, March 1, 1911 (SPWS 311).jpg

Original file(768 × 605 pixels, file size: 87 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents


Summary edit

English: Powerhouse excavation, March 1, 1911   (Wikidata search (Cirrus search) Wikidata query (SPARQL)  Create new Wikidata item based on this file)
Photographer
Unknown authorUnknown author
Title
English: Powerhouse excavation, March 1, 1911
Description
English: Construction photographs of the White River Power Plant, a hydroelectric facility on the White River, built by the Pacific Coast Power Company, 1909-1911. This company was acquired by Puget Sound Traction, Light & Power Company in 1912.

Caption on image: Excavation for power station, looking north, J.O. 397, No. 318, 3-1-'11.

PH Coll 269.698

  • Subjects (LCTGM): Excavation--Washington (State)
  • Subjects (LCSH): Hydroelectric power plants--Washington (State)--Design and construction; Deiringer (Wash.)
Depicted place
English: United States--Washington (State)--White River Power Plant
Date Taken on 1 March 1911
Medium
English: silver gelatin, b&w : 8 x 10 in.
institution QS:P195,Q219563
Current location
Accession number
Source
Permission
(Reusing this file)
Public domain
This work is in the public domain in the United States because it was published (or registered with the U.S. Copyright Office) before January 1, 1929.
Order Number
InfoField
WWDL0132

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:38, 16 July 2021Thumbnail for version as of 16:38, 16 July 2021768 × 605 (87 KB)BMacZeroBot (talk | contribs)Automatic lossless crop (watermark)
16:38, 16 July 2021Thumbnail for version as of 16:38, 16 July 2021768 × 635 (90 KB)BMacZeroBot (talk | contribs)Batch upload (Commons:Batch uploading/University of Washington Digital Collections)