File:Réparation des fissures causées par le séisme du 11 novembre 2019.jpg

Original file(4,625 × 3,577 pixels, file size: 3.75 MB, MIME type: image/jpeg)

Captions

Captions

Repair of cracks caused by the earthquake of November 11, 2019.

Summary edit

Description
Français : Au Teil, trois ans après le séisme une grande partie de la ville est toujours en travaux. (Photo prise en novembre 2022).
English: In Le Teil, three years after the earthquake, a large part of the town is still under construction. (Photo taken in November 2022).
Date
Source Own work
Author Celeda

Le Teil, Ardèche, Auvergne-Rhône-Alpes, France.

Licensing edit

I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:25, 28 November 2022Thumbnail for version as of 09:25, 28 November 20224,625 × 3,577 (3.75 MB)Celeda (talk | contribs)Uploaded own work with UploadWizard

Metadata