File:Stub ramp on Red Bridge viaduct, July 2021.JPG

Original file(5,184 × 3,888 pixels, file size: 3.05 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

edit
Description
English: Detail of the Red Bridge viaduct under construction in July 2021. This bridge carries the outbound track from Lechmere to Union Square. The stub ramp at left is a provision for a spur track allowing outbound trains direct access to the vehicle maintenance facility. The spur was removed during value engineering, but the stub was kept for potential future addition.
Date Taken on 7 July 2021
Source Own work
Author Pi.1415926535
Camera location42° 22′ 31.75″ N, 71° 04′ 51.57″ W  Heading=135° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

edit
I, the copyright holder of this work, hereby publish it under the following licenses:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
GNU head Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.
You may select the license of your choice.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:07, 15 July 2021Thumbnail for version as of 04:07, 15 July 20215,184 × 3,888 (3.05 MB)Pi.1415926535 (talk | contribs)== {{int:filedesc}} == {{Information |Description ={{en|1=Detail of the Red Bridge viaduct under construction in July 2021. This bridge carries the outbound track from Lechmere to Union Square. The stub ramp at left is a provision for a spur track allowing outbound trains direct access to the vehicle maintenance facility. The spur was removed during value engineering, but the stub was kept for potential future addition.}} |Source ={{own}} |Author =[[User:Pi.1415926535|Pi.14...

There are no pages that use this file.

Metadata