File:Tambubong Interchange 23.jpg

Original file(5,184 × 3,888 pixels, file size: 5.17 MB, MIME type: image/jpeg)

Captions

Captions

Tambubong Interchange

Summary

edit
Description
English: Tambubong Interchange (is the 3rd Interchange in Bocaue which opened on July 2, 2020, at Narra Street, Km. 27 mi. 17 Exit 27 Tambubong Taal, Tambubong (Bocaue) along Caingin-Taal-Tambobong Road, in Barangays Taal-Tambobong, Bocaue boundary; it features a 290-meter 2-lane southbound entry, a 180-meter 2-lane northbound entry, and a 240-meter 3-lane northbound exit, with 3 exclusive radio frequency identification (RFID) lanes costs are P80-milyon by DPWH for entry and exit ramps and P90 milyon by NLEX Corp. for toll plazas and electrical systems; the construction of this interchanges began about August 2019 - NB Entry-Exit and SB Entry Ramps, Toll Plaza, NLEx).
Date
Source Own work
Author FBenjr123

Licensing

edit
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:48, 25 January 2022Thumbnail for version as of 03:48, 25 January 20225,184 × 3,888 (5.17 MB)FBenjr123 (talk | contribs)Uploaded own work with UploadWizard

There are no pages that use this file.

Metadata