File:US Navy 030426-N-1050K-052 The U.S. Navy's Elevated Causeway System-Modular (ELCAS-M) stands completed at Camp Patriot.jpg

Original file(2,234 × 1,500 pixels, file size: 1.08 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary edit

Description
English: Camp Patriot, Kuwait (Apr. 26, 2003) -- The U.S. Navy's Elevated Causeway System-Modular (ELCAS-M) stands completed at Camp Patriot. ELCAS (M) is an expeditionary pier used to bridge the surf zone, providing an interface between cargo vessels and the beach. Constructed by the U.S. Navy Seabees this 1,400-foot pier is being used to support Joint Logistics Over the Shore (JLOTS), and the back-load of what will be thousands of cargo containers holding military supplies and equipment returning home from Operation Iraqi Freedom. Operation Iraqi Freedom is the multi-national coalition effort to liberate the Iraqi people, eliminate Iraq’s weapons of mass destruction, and end the regime of Saddam Hussein. U.S. Navy photo by Journalist 1st Class Joseph Krypel. (RELEASED)
Date
Source

This image was released by the United States Navy with the ID 030426-N-1050K-052 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author U.S. Navy photo by Journalist 1st Class Joseph Krypel.

Licensing edit

Public domain
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:33, 22 October 2009Thumbnail for version as of 08:33, 22 October 20092,234 × 1,500 (1.08 MB)BotMultichillT (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Camp Patriot, Kuwait (Apr. 26, 2003) -- The U.S. Navy's Elevated Causeway System-Modular (ELCAS-M) stands completed at Camp Patriot. ELCAS (M) is an expeditionary pier used to bridge the surf zone,

There are no pages that use this file.

Metadata