File:US Navy 090401-N-9985W-034 Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys from Naval Station Norfolk.jpg
![File:US Navy 090401-N-9985W-034 Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys from Naval Station Norfolk.jpg](https://upload.wikimedia.org/wikipedia/commons/thumb/4/44/US_Navy_090401-N-9985W-034_Sailors_assigned_to_the_aircraft_carrier_USS_George_H.W._Bush_%28CVN_77%29_handle_lines_for_the_Military_Sealift_Command_hospital_ship_USNS_Comfort_%28T-AH_20%29_as_the_ship_deploys_from_Naval_Station_Norfolk.jpg/800px-thumbnail.jpg?20091106104052)
Original file (2,100 × 1,500 pixels, file size: 336 KB, MIME type: image/jpeg)
Captions
Captions
Summary
editDescriptionUS Navy 090401-N-9985W-034 Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys from Naval Station Norfolk.jpg |
English: NORFOLK (April 1, 2009) Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys from Naval Station Norfolk. Comfort is departing on a four-month deployment to the U.S. Southern Command area of responsibility supporting U.S. Naval Forces Southern Command and the U.S. 4th Fleet Continuing Promise 2009 (CP09) humanitarian mission. Comfort will provide the region with a mobile, flexible and rapidly responsive afloat medical capability for a number of missions and training opportunities in the Caribbean, Central and South America. (U.S. Navy photo by Mass Communication Specialist 3rd Class Tyler J. Wilson/Released) |
|||
Date | Taken on 1 April 2009 | |||
Source |
|
|||
Author | U.S. Navy photo by Mass Communication Specialist 3rd Class Tyler J. Wilson |
Licensing
editPublic domainPublic domainfalsefalse |
![]() |
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.
|
![]() |
This file has been identified as being free of known restrictions under copyright law, including all related and neighboring rights. |
https://creativecommons.org/publicdomain/mark/1.0/PDMCreative Commons Public Domain Mark 1.0falsefalse
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 10:40, 6 November 2009 | ![]() | 2,100 × 1,500 (336 KB) | BotMultichillT (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=NORFOLK (April 1, 2009) Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | 090401-N-9985W-034 NORFOLK (April 1, 2009) Sailors assigned to the aircraft carrier USS George H.W. Bush (CVN 77) handle lines for the Military Sealift Command hospital ship USNS Comfort (T-AH 20) as the ship deploys from Naval Station Norfolk. Comfort is departing on a four-month deployment to the U.S. Southern Command area of responsibility supporting U.S. Naval Forces Southern Command and the U.S. 4th Fleet Continuing Promise 2009 (CP09) humanitarian mission. Comfort will provide the region with a mobile, flexible and rapidly responsive afloat medical capability for a number of missions and training opportunities in the Caribbean, Central and South America. (U.S. Navy photo by Mass Communication Specialist 3rd Class Tyler J. Wilson/Released) |
---|---|
Camera manufacturer | NIKON CORPORATION |
Camera model | NIKON D300 |
Author | MC3 Tyler J. Wilson |
Exposure time | 1/2,500 sec (0.0004) |
F-number | f/3.5 |
ISO speed rating | 200 |
Date and time of data generation | 10:49, 1 April 2009 |
Lens focal length | 30 mm |
Orientation | Normal |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | Adobe Photoshop CS3 Macintosh |
File change date and time | 12:55, 2 April 2009 |
Y and C positioning | Co-sited |
Exposure Program | Manual |
Exif version | 2.21 |
Date and time of digitizing | 10:49, 1 April 2009 |
Image compression mode | 4 |
APEX exposure bias | 0 |
Maximum land aperture | 3 APEX (f/2.83) |
Metering mode | Center weighted average |
Light source | Unknown |
Flash | Flash did not fire |
DateTime subseconds | 51 |
DateTimeOriginal subseconds | 51 |
DateTimeDigitized subseconds | 51 |
Color space | sRGB |
Sensing method | One-chip color area sensor |
Custom image processing | Normal process |
Exposure mode | Manual exposure |
White balance | Auto white balance |
Digital zoom ratio | 1 |
Focal length in 35 mm film | 45 mm |
Scene capture type | Standard |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Unknown |