Commons:Photo challenge/2024 - June - Construction sites/Voting
Voting will end at midnight UTC on 31 July 2024. The theme was Construction sites.
Voting is open to all registered contributors who have held accounts for at least 10 days and made 50 edits, and also to new Commons contributors who have entered the challenge with a picture.
Users cannot vote for their own picture.
Voters may select up to three photographs to award points to their 1st / 2nd / 3rd place images, but can give Highly Commended praise to any other photos they wish.
- 1st place ★★★ with
*{{3/3*}} -- ~~~~
- 2nd place ★★★ with
*{{2/3*}} -- ~~~~
- 3rd place ★★★ with
*{{1/3*}} -- ~~~~
- Highly commended ♥ with
*{{0/3*}} -- ~~~~
In the interests of fairness, please try to review the images without looking to see who the photographer was and without looking at the current votes. That way, all the images get the same chance for your attention.
In addition to technical and artistic merit, voters should consider how well the photograph meets the challenge theme. Voting will be open for period of one month.
Voters who voted for more than one 1st, 2nd or 3rd place will have those votes converted to Highly Commended praises. Other votes not complying with the requirements will be removed. In some cases users might be asked to correct their votes after voting ends.
Sample
edit(Full size image)
- ★★★ Great font! -- Colin (talk) 18:22, 2 January 2014 (UTC)
- ★★★ -- Another person 18:20, 2 January 2014 (UTC)
- ★★★ Cool. Love it. -- Yet another person 18:32, 2 January 2014 (UTC)
- ♥ Beautiful -- Someone else 13:30 3 January 2014 (UTC)
1. Parliament-construction
edit(Full size image)
Taken: 10 April 2021 Uploaded: 02 June 2024 Size: 3024 × 4032 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
2. 279 Park Ave. under construction
edit(Full size image)
Taken: 08 May 2024 Uploaded: 02 June 2024 Size: 3024 × 4032 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
|
3. Construction site for the Paris 2024 Olympic Games (2)
edit(Full size image)
Taken: 10 May 2024 Uploaded: 02 June 2024 Size: 4896 × 2752 (13.4 MP)
Current votes – please choose your own winners before looking |
---|
4. Villeneuve d'Ascq Construction du Grand Stade Lille Métropole 08-04-2012
edit(Full size image)
Taken: 08 April 2012 Uploaded: 02 June 2024 Size: 3780 × 2018 (7.6 MP)
Current votes – please choose your own winners before looking |
---|
5. Démolition de l'ancien Stade Municipal Emmanuel Thery juillet 2019
edit(Full size image)
Taken: 21 July 2019 Uploaded: 02 June 2024 Size: 2809 × 2222 (6.2 MP)
Current votes – please choose your own winners before looking |
---|
6. Construction of a building at a mall
edit(Full size image)
Taken: 12 April 2023 Uploaded: 03 June 2024 Size: 6000 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
7. Descending worker
edit(Full size image)
Taken: 16 March 2018 Uploaded: 03 June 2024 Size: 4500 × 3000 (13.5 MP)
Current votes – please choose your own winners before looking |
---|
8. 正在进行地面铺砖的施工
edit(Full size image)
Taken: 03 June 2024 Uploaded: 03 June 2024 Size: 1280 × 1707 (2.1 MP)
Current votes – please choose your own winners before looking |
---|
9. Construction site off the highway
edit(Full size image)
Taken: 03 June 2024 Uploaded: 03 June 2024 Size: 1207 × 1972 (2.3 MP)
Current votes – please choose your own winners before looking |
---|
10. Construction next to the subway
edit(Full size image)
Taken: 01 June 2024 Uploaded: 03 June 2024 Size: 3024 × 4032 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
11. Gangnam milk tea shop
edit(Full size image)
Taken: 18 December 2023 Uploaded: 03 June 2024 Size: 3024 × 4032 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
12. 刚完成的佛像搭建
edit(Full size image)
Taken: 03 June 2024 Uploaded: 03 June 2024 Size: 1440 × 1080 (1.5 MP)
Current votes – please choose your own winners before looking |
---|
|
13. A residential area under construction
edit(Full size image)
Taken: 17 January 2024 Uploaded: 03 June 2024 Size: 1170 × 1342 (1.5 MP)
Current votes – please choose your own winners before looking |
---|
14. A seaside construction site in Busan
edit(Full size image)
Taken: 03 June 2024 Uploaded: 03 June 2024 Size: 1280 × 1706 (2.1 MP)
Current votes – please choose your own winners before looking |
---|
|
15. Urban Transformation in Fikirtepe
edit(Full size image)
Taken: 01 September 2022 Uploaded: 03 June 2024 Size: 12000 × 9000 (108.0 MP)
Current votes – please choose your own winners before looking |
---|
16. Australian Sailor Monument under construction, Rockingham Naval Memorial Park, June 2024 02
edit(Full size image)
Taken: 04 June 2024 Uploaded: 04 June 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
17. (CHN-Shanghai) Beiheng Passageway Construction @ Zhoujiazui Road 2023-06-05
edit(Full size image)
Taken: 05 June 2023 Uploaded: 04 June 2024 Size: 3707 × 2966 (10.9 MP)
Current votes – please choose your own winners before looking |
---|
18. Konstruksi kuda-kuda Baja Konvensional
edit(Full size image)
Taken: 16 November 2019 Uploaded: 04 June 2024 Size: 5152 × 3864 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
19. Tokyo 20170314 150556
edit(Full size image)
Taken: 14 March 2017 Uploaded: 04 June 2024 Size: 3648 × 2056 (7.5 MP)
Current votes – please choose your own winners before looking |
---|
|
20. Notre-Dame reconstruction (6)
edit(Full size image)
Taken: 09 May 2024 Uploaded: 04 June 2024 Size: 4896 × 2752 (13.4 MP)
Current votes – please choose your own winners before looking |
---|
|
21. Notre-Dame reconstruction (4)
edit(Full size image)
Taken: 09 May 2024 Uploaded: 04 June 2024 Size: 4896 × 2752 (13.4 MP)
Current votes – please choose your own winners before looking |
---|
22. Notre-Dame reconstruction (2)
edit(Full size image)
Taken: 09 May 2024 Uploaded: 04 June 2024 Size: 4896 × 2752 (13.4 MP)
Current votes – please choose your own winners before looking |
---|
23. Zimmermann nagelt Verschalung-20160531-RM-110839
edit(Full size image)
Taken: 02 June 2016 Uploaded: 04 June 2024 Size: 4574 × 3430 (15.6 MP)
Current votes – please choose your own winners before looking |
---|
|
24. Ebing Haltepunkt Arbeiter mit Fräse-20160831-RM-094244
edit(Full size image)
Taken: 31 August 2016 Uploaded: 04 June 2024 Size: 3686 × 3456 (12.7 MP)
Current votes – please choose your own winners before looking |
---|
|
25. Ebing Brücke Arbeiter-20160907-RM-114411
edit(Full size image)
Taken: 07 September 2016 Uploaded: 04 June 2024 Size: 2861 × 3815 (10.9 MP)
Current votes – please choose your own winners before looking |
---|
|
26. Queued for work in progress
edit(Full size image)
Taken: 05 June 2024 Uploaded: 05 June 2024 Size: 4863 × 3721 (18.0 MP)
Current votes – please choose your own winners before looking |
---|
27. Misato 20140712 180835
edit(Full size image)
Taken: 12 July 2014 Uploaded: 05 June 2024 Size: 3648 × 2056 (7.5 MP)
Current votes – please choose your own winners before looking |
---|
28. Pouring of Concrete Foundation
edit(Full size image)
Taken: 25 May 2007 Uploaded: 05 June 2024 Size: 1800 × 1197 (2.1 MP)
Current votes – please choose your own winners before looking |
---|
|
29. Groningen (stad), bouwkraan boven het stationsgebied. (actm.)
edit(Full size image)
Taken: 13 June 2022 Uploaded: 07 June 2024 Size: 4761 × 2235 (10.6 MP)
Current votes – please choose your own winners before looking |
---|
|
30. Stavoren. Scheepskraan (actm.)
edit(Full size image)
Taken: 31 May 2021 Uploaded: 07 June 2024 Size: 4327 × 3091 (13.3 MP)
Current votes – please choose your own winners before looking |
---|
31. Стройплощадка
edit(Full size image)
Taken: 29 September 2014 Uploaded: 07 June 2024 Size: 1936 × 1226 (2.3 MP)
Current votes – please choose your own winners before looking |
---|
32. Стройплощадка 2
edit(Full size image)
Taken: 14 October 2014 Uploaded: 07 June 2024 Size: 1899 × 1222 (2.3 MP)
Current votes – please choose your own winners before looking |
---|
33. Humber Bay Park, Toronto
edit(Full size image)
Uploaded: 07 June 2024 Size: 2664 × 1915 (5.1 MP)
Current votes – please choose your own winners before looking |
---|
34. Construction ongoing
edit(Full size image)
Taken: 29 June 2016 Uploaded: 07 June 2024 Size: 3690 × 2461 (9.0 MP)
Current votes – please choose your own winners before looking |
---|
35. Greenhouse building in progress
edit(Full size image)
Taken: 01 April 2015 Uploaded: 07 June 2024 Size: 2592 × 3872 (10.0 MP)
Current votes – please choose your own winners before looking |
---|
36. Arc construction in process
edit(Full size image)
Taken: 29 January 2011 Uploaded: 07 June 2024 Size: 3522 × 2437 (8.5 MP)
Current votes – please choose your own winners before looking |
---|
37. Construction and deconstruction - a process in single frame
edit(Full size image)
Taken: 06 May 2016 Uploaded: 07 June 2024 Size: 1980 × 2485 (4.9 MP)
Current votes – please choose your own winners before looking |
---|
38. Machine on site sky
edit(Full size image)
Taken: 07 June 2024 Uploaded: 07 June 2024 Size: 3456 × 2304 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
39. Crane and concrete pipe on site 2
edit(Full size image)
Taken: 07 June 2024 Uploaded: 07 June 2024 Size: 3456 × 2304 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
|
40. Crane on site sky
edit(Full size image)
Taken: 07 June 2024 Uploaded: 07 June 2024 Size: 3456 × 2304 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
41. Construction site Container
edit(Full size image)
Taken: 04 October 2023 Uploaded: 07 June 2024 Size: 2304 × 3456 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
42. Tokyo 20110130 135240
edit(Full size image)
Taken: 30 January 2011 Uploaded: 08 June 2024 Size: 2784 × 1568 (4.3 MP)
Current votes – please choose your own winners before looking |
---|
|
43. Fukushima 20201102 145517
edit(Full size image)
Taken: 02 November 2020 Uploaded: 09 June 2024 Size: 4608 × 2592 (11.9 MP)
Current votes – please choose your own winners before looking |
---|
44. 589 Fulton Street under construction
edit(Full size image)
Taken: 07 June 2024 Uploaded: 09 June 2024 Size: 4011 × 3008 (12.0 MP)
Current votes – please choose your own winners before looking |
---|
45. 2020.11.20 Construction Site
edit(Full size image)
Taken: 20 November 2020 Uploaded: 10 June 2024 Size: 2033 × 1280 (2.6 MP)
Current votes – please choose your own winners before looking |
---|
46. House Construction
edit(Full size image)
Taken: 08 June 2024 Uploaded: 10 June 2024 Size: 2412 × 1472 (3.5 MP)
Current votes – please choose your own winners before looking |
---|
|
47. Construction site at rgipt
edit(Full size image)
Taken: 08 May 2024 Uploaded: 10 June 2024 Size: 960 × 1280 (1.2 MP)
Current votes – please choose your own winners before looking |
---|
48. Hospital Project in Ve in the Afadzato South District
edit(Full size image)
Taken: 08 March 2024 Uploaded: 11 June 2024 Size: 4032 × 3024 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
49. 2022 construction de la tour Alta
edit(Full size image)
Taken: 22 October 2022 Uploaded: 11 June 2024 Size: 4288 × 2848 (12.2 MP)
Current votes – please choose your own winners before looking |
---|
50. 2020 09 20 Bouygues White Pearl (Le Havre)
edit(Full size image)
Taken: 20 September 2020 Uploaded: 11 June 2024 Size: 4288 × 2848 (12.2 MP)
Current votes – please choose your own winners before looking |
---|
|
51. Ongoing construction at railway station
edit(Full size image)
Taken: 11 June 2024 Uploaded: 11 June 2024 Size: 1600 × 1200 (1.9 MP)
Current votes – please choose your own winners before looking |
---|
52. Housing unit construction
edit(Full size image)
Taken: 10 June 2024 Uploaded: 11 June 2024 Size: 4128 × 2322 (9.5 MP)
Current votes – please choose your own winners before looking |
---|
53. Abandoned building reconstructed
edit(Full size image)
Taken: 09 June 2024 Uploaded: 11 June 2024 Size: 4128 × 2322 (9.5 MP)
Current votes – please choose your own winners before looking |
---|
54. Preparation for soft mate of Space Shuttle Endeavour to its external fuel tank at Samuel Oschin Air and Space Center, Los Angeles, California, US
edit(Full size image)
Taken: 29 January 2024 Uploaded: 12 June 2024 Size: 6240 × 4160 (25.9 MP)
Current votes – please choose your own winners before looking |
---|
55. Construction of a viewing gallery around Space Shuttle Endeavour, its external tank, and solid rocket boosters at Samuel Oschin Air and Space Center, Los Angeles, California, US
edit(Full size image)
Taken: 29 January 2024 Uploaded: 12 June 2024 Size: 6240 × 4160 (25.9 MP)
Current votes – please choose your own winners before looking |
---|
56. Construction of Samuel Oschin Air and Space Center around Space Shuttle Endeavour, Los Angeles, California, US
edit(Full size image)
Taken: 19 April 2024 Uploaded: 12 June 2024 Size: 6240 × 4160 (25.9 MP)
Current votes – please choose your own winners before looking |
---|
57. Labour Intensive Public Works Road Project
edit(Full size image)
Taken: 03 January 2022 Uploaded: 12 June 2024 Size: 5568 × 3712 (20.6 MP)
Current votes – please choose your own winners before looking |
---|
|
58. 2. Stammstrecke S-Bahn München 04
edit(Full size image)
Taken: 12 June 2024 Uploaded: 12 June 2024 Size: 3479 × 5219 (18.1 MP)
Current votes – please choose your own winners before looking |
---|
59. 2. Stammstrecke S-Bahnhof Laim 03
edit(Full size image)
Taken: 12 June 2024 Uploaded: 12 June 2024 Size: 5191 × 3461 (17.9 MP)
Current votes – please choose your own winners before looking |
---|
60. 2. Stammstrecke S-Bahnhof Laim 01
edit(Full size image)
Taken: 12 June 2024 Uploaded: 12 June 2024 Size: 3648 × 5472 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
61. 2. Stammstrecke S-Bahn München 07
edit(Full size image)
Taken: 12 June 2024 Uploaded: 12 June 2024 Size: 3384 × 5076 (17.1 MP)
Current votes – please choose your own winners before looking |
---|
62. Roof walker
edit(Full size image)
Taken: 02 March 2018 Uploaded: 13 June 2024 Size: 4500 × 3000 (13.5 MP)
Current votes – please choose your own winners before looking |
---|
|
63. 新北捷運環狀線的403強震後修復工程的施工現場(2024夜間)
edit(Full size image)
Taken: 12 June 2024 Uploaded: 13 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
64. Apartment building under construction
edit(Full size image)
Taken: 16 May 2017 Uploaded: 13 June 2024 Size: 3943 × 2686 (10.5 MP)
Current votes – please choose your own winners before looking |
---|
65. Heating pipes prepared for replacement of worn-out
edit(Full size image)
Taken: 23 May 2020 Uploaded: 13 June 2024 Size: 4379 × 2464 (10.7 MP)
Current votes – please choose your own winners before looking |
---|
66. Stone crushed into building material
edit(Full size image)
Taken: 16 May 2020 Uploaded: 13 June 2024 Size: 3640 × 1970 (7.1 MP)
Current votes – please choose your own winners before looking |
---|
67. Betonverarbeitung
edit(Full size image)
Taken: 21 December 2015 Uploaded: 14 June 2024 Size: 2340 × 4160 (9.7 MP)
Current votes – please choose your own winners before looking |
---|
|
68. Rotary Bored Piling
edit(Full size image)
Taken: 26 July 2016 Uploaded: 14 June 2024 Size: 2251 × 3000 (6.7 MP)
Current votes – please choose your own winners before looking |
---|
|
69. Assembling of big satellite dish 02
edit(Full size image)
Taken: 16 October 2008 Uploaded: 14 June 2024 Size: 3448 × 2298 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
|
70. Assembling of big satellite dish 01
edit(Full size image)
Taken: 16 October 2008 Uploaded: 14 June 2024 Size: 3318 × 2212 (7.3 MP)
Current votes – please choose your own winners before looking |
---|
71. 2011 08 travaux tramway
edit(Full size image)
Taken: 01 August 2011 Uploaded: 15 June 2024 Size: 4288 × 2848 (12.2 MP)
Current votes – please choose your own winners before looking |
---|
72. Travessia pedonal ao longo da Avenida de Guimarães na Taipa, Macau
edit(Full size image)
Taken: 04 November 2020 Uploaded: 15 June 2024 Size: 3456 × 4608 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
73. Building remaining facade at Taipa, Macau
edit(Full size image)
Taken: 15 June 2024 Uploaded: 15 June 2024 Size: 1321 × 1761 (2.3 MP)
Current votes – please choose your own winners before looking |
---|
74. Buildings in Hengqin face to Macau
edit(Full size image)
Taken: 30 January 2022 Uploaded: 15 June 2024 Size: 5184 × 3888 (20.1 MP)
Current votes – please choose your own winners before looking |
---|
75. Workers at building under construction
edit(Full size image)
Taken: 16 September 2023 Uploaded: 15 June 2024 Size: 5065 × 3800 (19.2 MP)
Current votes – please choose your own winners before looking |
---|
|
76. 2008 06 12 Travaux A75
edit(Full size image)
Taken: 12 June 2008 Uploaded: 15 June 2024 Size: 1600 × 1200 (1.9 MP)
Current votes – please choose your own winners before looking |
---|
77. 2009 07 12 Travaux A75 (1)
edit(Full size image)
Taken: 12 July 2009 Uploaded: 15 June 2024 Size: 4272 × 2848 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
78. 2009 07 12 Travaux A75 (2)
edit(Full size image)
Taken: 12 July 2009 Uploaded: 15 June 2024 Size: 4272 × 2848 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
79. 2009 07 12 Travaux A75 (3)
edit(Full size image)
Taken: 12 July 2009 Uploaded: 15 June 2024 Size: 4272 × 2848 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
80. Unteroberndorf ABS Baustelle Baumaterial-20160811-RM-113841
edit(Full size image)
Taken: 11 August 2016 Uploaded: 15 June 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
81. Seetor City Campus
edit(Full size image)
Taken: 23 March 2022 Uploaded: 16 June 2024 Size: 4606 × 3070 (14.1 MP)
Current votes – please choose your own winners before looking |
---|
|
82. Стройка в кинетическом песке
edit(Full size image)
Taken: 16 June 2024 Uploaded: 16 June 2024 Size: 3000 × 4000 (12.0 MP)
Current votes – please choose your own winners before looking |
---|
83. Baustelle 001 2014 03 14
edit(Full size image)
Uploaded: 16 June 2024 Size: 5184 × 2535 (13.1 MP)
Current votes – please choose your own winners before looking |
---|
84. Baustelle 002 2015 03 08
edit(Full size image)
Taken: 08 March 2015 Uploaded: 16 June 2024 Size: 5184 × 3376 (17.5 MP)
Current votes – please choose your own winners before looking |
---|
85. Baustelle 003 2015 08 31
edit(Full size image)
Taken: 31 August 2015 Uploaded: 16 June 2024 Size: 3497 × 4094 (14.3 MP)
Current votes – please choose your own winners before looking |
---|
|
86. Baustelle 004 2021 08 04
edit(Full size image)
Taken: 04 August 2021 Uploaded: 16 June 2024 Size: 5228 × 3298 (17.2 MP)
Current votes – please choose your own winners before looking |
---|
87. Baustelle - Karl-Friedrich-Binder-Str, 74523 Schwäbisch Hall - 2024-06-09
edit(Full size image)
Taken: 09 June 2024 Uploaded: 16 June 2024 Size: 4624 × 3468 (16.0 MP)
Current votes – please choose your own winners before looking |
---|
88. Construction site -Karl-Friedrich-Binder-Str, 74523 Schwäbisch Hall 2024-06-09
edit(Full size image)
Taken: 09 June 2024 Uploaded: 16 June 2024 Size: 4624 × 3468 (16.0 MP)
Current votes – please choose your own winners before looking |
---|
89. Crane - Karl-Friedrich-Binder-Str, 74523 Schwäbisch Hall 2022-10-30
edit(Full size image)
Taken: 30 October 2022 Uploaded: 16 June 2024 Size: 3000 × 4000 (12.0 MP)
Current votes – please choose your own winners before looking |
---|
|
90. Baustelle - Barcelona, Spain 2024-05-31
edit(Full size image)
Taken: 31 May 2024 Uploaded: 16 June 2024 Size: 4624 × 3468 (16.0 MP)
Current votes – please choose your own winners before looking |
---|
91. UnicreditTower in Piazza Gae Aulenti Construction site
edit(Full size image)
Taken: 17 November 2009 Uploaded: 17 June 2024 Size: 3456 × 2304 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
|
92. View of the construction site of Unicredit Tower from Corso Como
edit(Full size image)
Taken: 17 November 2009 Uploaded: 17 June 2024 Size: 3456 × 2304 (7.9 MP)
Current votes – please choose your own winners before looking |
---|
93. Foto ristrutturazione per la CUCINA PROTOTIPALE DELLA DIETA MEDITERRANEA DI PALAZZO TUMMINELLI 01
edit(Full size image)
Taken: 18 June 2024 Uploaded: 18 June 2024 Size: 3024 × 4032 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
94. Mani-Mandapa renovation Thanjavur India
edit(Full size image)
Taken: 19 June 2024 Uploaded: 19 June 2024 Size: 2292 × 3056 (7.0 MP)
Current votes – please choose your own winners before looking |
---|
95. Red Tower Crane - Knoxville, Tennessee - October 18, 2014
edit(Full size image)
Taken: 18 October 2014 Uploaded: 19 June 2024 Size: 4698 × 3132 (14.7 MP)
Current votes – please choose your own winners before looking |
---|
96. Tondi raudteeülesõit.IMG 20240421 135613
edit(Full size image)
Taken: 21 April 2024 Uploaded: 20 June 2024 Size: 3968 × 2976 (11.8 MP)
Current votes – please choose your own winners before looking |
---|
97. Old heating pipes needing replacement
edit(Full size image)
Taken: 02 June 2020 Uploaded: 20 June 2024 Size: 3059 × 1990 (6.0 MP)
Current votes – please choose your own winners before looking |
---|
|
98. Baustelle in Chemnitz, Sachsen 2H1A7936WI
edit(Full size image)
Taken: 18 March 2024 Uploaded: 20 June 2024 Size: 5192 × 3267 (16.9 MP)
Current votes – please choose your own winners before looking |
---|
99. Baustelle im Windpark Gersdorf-Bernsdorf, Sachsen 2H1A0184WI
edit(Full size image)
Taken: 30 October 2019 Uploaded: 20 June 2024 Size: 5207 × 2686 (13.9 MP)
Current votes – please choose your own winners before looking |
---|
100. Baustelle im Windpark Gersdorf-Bernsdorf, Sachsen 2H1A0204WI
edit(Full size image)
Taken: 30 October 2019 Uploaded: 20 June 2024 Size: 5275 × 2633 (13.8 MP)
Current votes – please choose your own winners before looking |
---|
101. Umbau der Paltrockwindmühle Kyhna 2H1A5531WI
edit(Full size image)
Taken: 29 May 2023 Uploaded: 20 June 2024 Size: 3028 × 4037 (12.2 MP)
Current votes – please choose your own winners before looking |
---|
102. Tondi road construction.IMG 20240620 181355
edit(Full size image)
Taken: 20 June 2024 Uploaded: 21 June 2024 Size: 3968 × 2976 (11.8 MP)
Current votes – please choose your own winners before looking |
---|
103. This bikeway section was closed for the reconstruction project of Zhongzheng Bridge
edit(Full size image)
Taken: 21 June 2024 Uploaded: 21 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
|
104. Renovation of Thirumalai Naicker Palace, Madurai, Tamilnadu India
edit(Full size image)
Taken: 05 May 2024 Uploaded: 22 June 2024 Size: 1384 × 2461 (3.4 MP)
Current votes – please choose your own winners before looking |
---|
|
105. Cantiere di cava abbandonata
edit(Full size image)
Taken: 28 January 2024 Uploaded: 22 June 2024 Size: 6000 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
106. Baustelle Stuttgart 21
edit(Full size image)
Taken: 17 June 2024 Uploaded: 22 June 2024 Size: 4466 × 6844 (30.5 MP)
Current votes – please choose your own winners before looking |
---|
|
107. A house under construction
edit(Full size image)
Taken: 07 June 2024 Uploaded: 22 June 2024 Size: 4928 × 3264 (16.0 MP)
Current votes – please choose your own winners before looking |
---|
108. Praha Michle Michelska 2 rekonstrukce
edit(Full size image)
Taken: 17 June 2024 Uploaded: 23 June 2024 Size: 3120 × 2868 (8.9 MP)
Current votes – please choose your own winners before looking |
---|
109. Construction of bridge
edit(Full size image)
Taken: 15 June 2024 Uploaded: 23 June 2024 Size: 4160 × 3120 (12.9 MP)
Current votes – please choose your own winners before looking |
---|
110. Men working on roof
edit(Full size image)
Taken: 17 June 2023 Uploaded: 23 June 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
111. Herstellung Betondecke 2
edit(Full size image)
Taken: 02 October 2023 Uploaded: 23 June 2024 Size: 6000 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
|
112. Ringers - Apartment complex in Alkmaar
edit(Full size image)
Taken: 22 June 2024 Uploaded: 23 June 2024 Size: 5525 × 3683 (20.3 MP)
Current votes – please choose your own winners before looking |
---|
113. Construction Site of New Taipei City Art Museum in the evening 202406
edit(Full size image)
Taken: 23 June 2024 Uploaded: 23 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
114. Instandsetzung traditionell
edit(Full size image)
Taken: 29 November 2012 Uploaded: 23 June 2024 Size: 4592 × 3056 (14.0 MP)
Current votes – please choose your own winners before looking |
---|
115. Gerüst am Mailänder Dom
edit(Full size image)
Taken: 19 March 2013 Uploaded: 23 June 2024 Size: 2606 × 2125 (5.5 MP)
Current votes – please choose your own winners before looking |
---|
116. Garagenbau
edit(Full size image)
Taken: 16 June 2024 Uploaded: 23 June 2024 Size: 4032 × 3056 (12.3 MP)
Current votes – please choose your own winners before looking |
---|
117. Haus in Ständerbauweise
edit(Full size image)
Taken: 29 May 2013 Uploaded: 23 June 2024 Size: 3056 × 4592 (14.0 MP)
Current votes – please choose your own winners before looking |
---|
118. Farbbefunduntersuchung 2
edit(Full size image)
Taken: 29 May 2018 Uploaded: 23 June 2024 Size: 5184 × 3456 (17.9 MP)
Current votes – please choose your own winners before looking |
---|
119. Building of World Trade Center in Batumi
edit(Full size image)
Taken: 12 February 2023 Uploaded: 24 June 2024 Size: 1944 × 2592 (5.0 MP)
Current votes – please choose your own winners before looking |
---|
120. The Bešenovo Monastery on the Fruška Gora. Serbia
edit(Full size image)
Taken: 16 May 2024 Uploaded: 25 June 2024 Size: 3580 × 2685 (9.6 MP)
Current votes – please choose your own winners before looking |
---|
121. Novi Sad - European Capital of Culture. Noon. City center
edit(Full size image)
Taken: 30 October 2023 Uploaded: 25 June 2024 Size: 4032 × 3024 (12.1 MP)
Current votes – please choose your own winners before looking |
---|
122. Остатки снесенного Дворца Молодежи 02
edit(Full size image)
Taken: 23 June 2024 Uploaded: 26 June 2024 Size: 4689 × 3241 (15.1 MP)
Current votes – please choose your own winners before looking |
---|
123. Клетка для красного шланга
edit(Full size image)
Taken: 12 June 2024 Uploaded: 26 June 2024 Size: 4624 × 3468 (16.0 MP)
Current votes – please choose your own winners before looking |
---|
124. 淡水淡江大橋施工現場的夜間模樣202406
edit(Full size image)
Taken: 27 June 2024 Uploaded: 26 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
125. Dam on the Tsna river - 09
edit(Full size image)
Taken: 18 November 2023 Uploaded: 27 June 2024 Size: 4787 × 3192 (15.2 MP)
Current votes – please choose your own winners before looking |
---|
|
126. Dam on the Tsna river - 10
edit(Full size image)
Taken: 18 November 2023 Uploaded: 27 June 2024 Size: 5184 × 3456 (17.9 MP)
Current votes – please choose your own winners before looking |
---|
127. An New Student Dorm
edit(Full size image)
Taken: 18 October 2022 Uploaded: 27 June 2024 Size: 6048 × 4024 (24.3 MP)
Current votes – please choose your own winners before looking |
---|
128. HH17-012 Hafencitybau
edit(Full size image)
Taken: 22 March 2017 Uploaded: 28 June 2024 Size: 4592 × 2576 (11.8 MP)
Current votes – please choose your own winners before looking |
---|
|
129. Ö23-101
edit(Full size image)
Taken: 15 June 2023 Uploaded: 28 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
|
130. Nam16-471
edit(Full size image)
Taken: 06 October 2016 Uploaded: 28 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
|
131. Ind18-024 Bambusbaugerüst
edit(Full size image)
Taken: 07 January 2018 Uploaded: 28 June 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
|
132. Grue sous la neige
edit(Full size image)
Taken: 18 January 2023 Uploaded: 28 June 2024 Size: 5160 × 3472 (17.9 MP)
Current votes – please choose your own winners before looking |
---|
133. Grues en contre plongée
edit(Full size image)
Taken: 29 September 2023 Uploaded: 28 June 2024 Size: 4000 × 3000 (12.0 MP)
Current votes – please choose your own winners before looking |
---|
|
134. Maison en cours de démolition au Japon
edit(Full size image)
Taken: 19 November 2023 Uploaded: 28 June 2024 Size: 4000 × 3000 (12.0 MP)
Current votes – please choose your own winners before looking |
---|
135. Construção da Futura Câmara de Valongo
edit(Full size image)
Taken: 02 June 2024 Uploaded: 29 June 2024 Size: 17416 × 4407 (76.7 MP)
Current votes – please choose your own winners before looking |
---|
136. Berliner Hauptbahnhof 510-1354
edit(Full size image)
Taken: 08 October 2005 Uploaded: 29 June 2024 Size: 3008 × 2000 (6.0 MP)
Current votes – please choose your own winners before looking |
---|
137. Baustelle Elbtower 2310-1693
edit(Full size image)
Taken: 28 October 2023 Uploaded: 29 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
138. Baustelle HafenCity 2101-0036
edit(Full size image)
Taken: 12 January 2021 Uploaded: 29 June 2024 Size: 5488 × 3662 (20.0 MP)
Current votes – please choose your own winners before looking |
---|
|
139. Baustelle Weimar 1906-0698
edit(Full size image)
Taken: 08 June 2019 Uploaded: 29 June 2024 Size: 5488 × 3662 (20.0 MP)
Current votes – please choose your own winners before looking |
---|
140. Bridge in Tambov - 01
edit(Full size image)
Taken: 15 August 2020 Uploaded: 29 June 2024 Size: 5184 × 3456 (17.9 MP)
Current votes – please choose your own winners before looking |
---|
141. Dreifaltigkeitskirche Renovierung
edit(Full size image)
Taken: 18 February 2018 Uploaded: 30 June 2024 Size: 5472 × 3648 (19.9 MP)
Current votes – please choose your own winners before looking |
---|
142. Speyer Verlegung Ferwaerme
edit(Full size image)
Taken: 14 July 2012 Uploaded: 30 June 2024 Size: 3696 × 2448 (9.0 MP)
Current votes – please choose your own winners before looking |
---|
143. Bonn 2018 construction site Bonner Loch
edit(Full size image)
Taken: 30 January 2018 Uploaded: 30 June 2024 Size: 6016 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
|
144. Charleroi - boulevard Roullier - avancement des travaux au 09-07-2022 - 03
edit(Full size image)
Taken: 09 July 2022 Uploaded: 30 June 2024 Size: 4712 × 3121 (14.7 MP)
Current votes – please choose your own winners before looking |
---|
145. Charleroi - place Vauban - travaux - 2022-11-11 - 03
edit(Full size image)
Taken: 11 November 2022 Uploaded: 30 June 2024 Size: 4523 × 2997 (13.5 MP)
Current votes – please choose your own winners before looking |
---|
146. Charleroi - place du Manège - travaux - 2021-08-25 - 01
edit(Full size image)
Taken: 25 August 2021 Uploaded: 30 June 2024 Size: 4814 × 3188 (15.3 MP)
Current votes – please choose your own winners before looking |
---|
147. Charleroi - esplanade de la Gare du Sud - travaux - 2023-05-16 - 01
edit(Full size image)
Taken: 16 May 2023 Uploaded: 30 June 2024 Size: 4104 × 2717 (11.1 MP)
Current votes – please choose your own winners before looking |
---|
148. 2013 foundation of Berlin palace
edit(Full size image)
Taken: 27 May 2013 Uploaded: 30 June 2024 Size: 6230 × 4319 (26.9 MP)
Current votes – please choose your own winners before looking |
---|
|
149. Construction site in the sandy soil of Berlin
edit(Full size image)
Taken: 27 May 2013 Uploaded: 30 June 2024 Size: 6230 × 4319 (26.9 MP)
Current votes – please choose your own winners before looking |
---|
|
150. Construção do novo Lidl de Valongo
edit(Full size image)
Taken: 31 May 2022 Uploaded: 30 June 2024 Size: 6720 × 4480 (30.1 MP)
Current votes – please choose your own winners before looking |
---|
151. Desconstrução do Pavilhão
edit(Full size image)
Taken: 31 May 2022 Uploaded: 30 June 2024 Size: 4326 × 2884 (12.4 MP)
Current votes – please choose your own winners before looking |
---|
152. 2013 Abriss der Wohnanlage O M Ungers am Lützowplatz Berlin
edit(Full size image)
Taken: 06 March 2013 Uploaded: 30 June 2024 Size: 6016 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
153. Administrativní budova pekáren Odkolek a staveniště v Praze Vysočanech
edit(Full size image)
Taken: 29 May 2024 Uploaded: 30 June 2024 Size: 6711 × 3835 (25.7 MP)
Current votes – please choose your own winners before looking |
---|
154. Staveniště v areálu autobusového terminálu Černý Most
edit(Full size image)
Taken: 07 June 2024 Uploaded: 30 June 2024 Size: 8000 × 6000 (48.0 MP)
Current votes – please choose your own winners before looking |
---|
155. 2024-06-07 Tanzania Road renewal 03
edit(Full size image)
Taken: 07 June 2024 Uploaded: 30 June 2024 Size: 3402 × 2268 (7.7 MP)
Current votes – please choose your own winners before looking |
---|
156. Výstavba OC Quadrio v Praze
edit(Full size image)
Taken: 21 October 2013 Uploaded: 30 June 2024 Size: 1944 × 2592 (5.0 MP)
Current votes – please choose your own winners before looking |
---|
157. Výstavba OC Quadrio v Praze v ulici Spálená
edit(Full size image)
Taken: 21 October 2013 Uploaded: 30 June 2024 Size: 2592 × 1944 (5.0 MP)
Current votes – please choose your own winners before looking |
---|
|
158. Zerlegung einer Stahlnietenbruecke bei gleichzeitiger Wasserkuehlung
edit(Full size image)
Taken: 14 July 2020 Uploaded: 30 June 2024 Size: 3527 × 3527 (12.4 MP)
Current votes – please choose your own winners before looking |
---|
|
159. Zerlegung einer Stahlnietenbruecke kurz nach dem Ausbau
edit(Full size image)
Taken: 15 July 2020 Uploaded: 30 June 2024 Size: 5282 × 2971 (15.6 MP)
Current votes – please choose your own winners before looking |
---|
|
160. Nieten einer im Abbau befindlichen Stahlbrücke
edit(Full size image)
Taken: 16 July 2020 Uploaded: 30 June 2024 Size: 6032 × 4032 (24.3 MP)
Current votes – please choose your own winners before looking |
---|
161. 2024-06-16 Zanzibar Stonetown 01
edit(Full size image)
Taken: 16 June 2024 Uploaded: 30 June 2024 Size: 2147 × 3220 (6.9 MP)
Current votes – please choose your own winners before looking |
---|
162. 2024-05-20 Hannover Kronsberg 0526
edit(Full size image)
Taken: 20 May 2024 Uploaded: 30 June 2024 Size: 6000 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
163. 2024-04-30 Carpenter at work DSC 0205
edit(Full size image)
Taken: 30 April 2024 Uploaded: 30 June 2024 Size: 6000 × 4000 (24.0 MP)
Current votes – please choose your own winners before looking |
---|
164. Stoneman Douglas High School, Parkland, FL - Demolition (0)
edit(Full size image)
Taken: 14 June 2024 Uploaded: 30 June 2024 Size: 1204 × 935 (1.1 MP)
Current votes – please choose your own winners before looking |
---|
165. Bridge Deconstruction
edit(Full size image)
Taken: 26 July 2010 Uploaded: 30 June 2024 Size: 3888 × 2592 (10.0 MP)
Current votes – please choose your own winners before looking |
---|
166. Stoneman Douglas High School, Parkland, FL - Demolition (2)
edit(Full size image)
Taken: 14 June 2024 Uploaded: 30 June 2024 Size: 1440 × 1080 (1.5 MP)
Current votes – please choose your own winners before looking |
---|
167. Construction site @ 4161 W Hillsboro Blvd, Coconut Creek, FL (1)
edit(Full size image)
Taken: 29 June 2024 Uploaded: 01 July 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
168. Construction site @ 4161 W Hillsboro Blvd, Coconut Creek, FL (2)
edit(Full size image)
Taken: 29 June 2024 Uploaded: 01 July 2024 Size: 4608 × 3456 (15.9 MP)
Current votes – please choose your own winners before looking |
---|
169. 20121007 visitors lookingAt BeauvaisCathedral foreverConstructionSite DSC00933 PtrQs
edit(Full size image)
Taken: 07 October 2012 Uploaded: 01 July 2024 Size: 3234 × 3955 (12.7 MP)
Current votes – please choose your own winners before looking |
---|
|
170. 20140812 crane forTightPlaces Bolzano DSC01839 PtrQs
edit(Full size image)
Taken: 12 August 2014 Uploaded: 01 July 2024 Size: 3273 × 5262 (17.2 MP)
Current votes – please choose your own winners before looking |
---|
171. 20220210 illuminated crane BraWo Park Brunswick byNight DSC02588 PtrQs
edit(Full size image)
Taken: 10 February 2022 Uploaded: 01 July 2024 Size: 4648 × 6396 (29.7 MP)
Current votes – please choose your own winners before looking |
---|
|
172. 20231104 mechanicalTamper mobileConstructionSite DSC04579 PtrQs
edit(Full size image)
Taken: 04 November 2023 Uploaded: 01 July 2024 Size: 5304 × 6661 (35.3 MP)
Current votes – please choose your own winners before looking |
---|
|
173. BKK construction site by Don Ramey Logan
edit(Full size image)
Taken: 04 January 2021 Uploaded: 01 July 2024 Size: 6192 × 8256 (51.1 MP)
Current votes – please choose your own winners before looking |
---|
|
174. 2024 06 27 ConstructionSite SK 0002
edit(Full size image)
Taken: 27 June 2024 Uploaded: 01 July 2024 Size: 3265 × 2259 (7.3 MP)
Current votes – please choose your own winners before looking |
---|